My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1991-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:30:34 PM
Creation date
2/25/2019 2:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1991-1992
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> STATE OF CALIFORNIA—ENVIRONMENTAL PROTECTIO•ENCY PETE WILSON,Govern <br /> DEPARTMENT OF TOXIC SUBSTANCES CONTROL <br /> REGION 1 <br /> 10151 CROYDON WAY,SUITE 3 <br /> SACRAMENTO,CA 95827-2106 -� <br /> (916)855-7700 <br /> s <br /> August 6, 1992 ' <br /> AUG <br /> ENVIRONMENTAL HEM-10 <br /> PE-FtN'hM7l SERV f�f�'� <br /> Mr. Robert Doss, P.E. <br /> Project Manager <br /> Pacific Gas and Electric Company <br /> Environmental Services <br /> 77 Beale Street, Room F-1636 <br /> San Francisco, California 94106 <br /> PG&E STOCKTON, MODIFICATION TO RI WORKPLAN <br /> Dear Mr. Doss: <br /> The Department of Toxic Substances Control (Department) <br /> hereby approves PG&E's proposed modifications to the phase II <br /> well installation plan. As a result, a fifth soil boring will be <br /> drilled to satisfy sampling requirements in the vicinity of <br /> monitoring well MWB-13 . Additionally, an air rotary casing <br /> hammer will be used to install the deep well. As discussed with <br /> Ms. Fanelli of CH2M Hill, when installing wells using this <br /> method, it is critical that the drive casing lead the drill bit <br /> when in a water producing zone to be screened. This would <br /> prevent introducing air into the water zone and producing an air <br /> lock effect. <br /> If you have questions, please contact me at (916) 855-7892 . <br /> Sincerely, <br /> J /Amador <br /> % Waste Management Engineer <br /> Site Mitigation Branch <br /> cc: Ms. Eileen Fanelli <br /> CH2M Hill <br /> 1111 Broadway, Suite 1200 <br /> Oakland, California 94607-4046 - <br /> - h <br />.. nm.e�rt.my.evaw. <br />
The URL can be used to link to this page
Your browser does not support the video tag.