My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1991-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:30:34 PM
Creation date
2/25/2019 2:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1991-1992
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> Pacific Gas and Electric, Company Environmental Services ECE� <br /> P.O. <br /> 0.Box 7640 n <br /> 415/973-7000 San Francisco, <br /> CA 94120 Q C T 2 U 1992 <br /> Direct <br /> opy411973-9 ENVIRONMENTAL HEALTH <br /> relecopy4157s73-s2o1 PI=RMIfi/�K�iVicLo <br /> October 15, 1992 <br /> Mr. Val F. Siebal <br /> California Environmental Protection Agency <br /> ' Department of Toxic Substances Control <br /> 10151 Croydon Way <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Siebal : <br /> Re: Docket #HSA 90/91-08 - Stockton Manufactured Gas Plant Site <br /> Subject: October 1992 Quarterly Summary Report <br /> This quarterly summary report was prepared in accordance with Provision <br /> 3.7 of the referenced order. This report summarizes technical <br /> activities conducted by PG&E in compliance with the order during the <br /> quarter from July through September 1992, and activities planned for the <br /> current and subsequent quarters. <br /> (a) Technical Activities Performed During Previous Quarter <br /> The second quarter monitoring report was submitted to DTSC on July <br /> 28. Monthly water level monitoring was conducted each month <br /> during the quarter as specified in the Workplan. <br /> Third quarterly water quality sampling was conducted during the <br /> third week of August. Analyses were conducted as specified in the <br /> Workplan with the deletion of phenols as agreed to by DTSC in your <br /> May 7 letter. <br /> A letter report documenting the completion of the Interim Remedial <br /> Measure for the Hazelton Avenue strip was submitted to DTSC on <br /> July 28, and a revised version submitted on September 22. <br /> The Phase 2 Supplemental RI Workplan for Area I was submitted and <br /> approved on August 6, 1992. Five borings and three wells were <br /> installed and sampled between August 3 and August 17. <br /> PG&E has continued preparing the draft Remedial Investigation (RI) <br /> Report and Risk Assessment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.