My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> San Francisco,CA 94120 <br /> 415/973-7000 <br /> Direct Dial 415/973- / �p <br /> Telecopy 415/973-9201 H �.3 <br /> February 23, 1995 0 <br /> James L. Tjosvold, P.E. <br /> Acting Chief, Site Mitigation Branch <br /> r California Environmental Protection Agency <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Re: Docket #HSA 90/91-008 -Proposed Revisions to the Groundwater <br /> Monitoring Program for the Stockton Former Manufactured Gas Plant Site <br /> Pacific Gas and Electric Company(PG&E) proposes to revise the quarterly groundwater <br /> monitoring program at its Stockton Former Manufactured Gas Plant Site. The proposal <br /> includes reducing the sampling frequency of some existing wells installed prior to the <br /> Phase III investigation from the groundwater monitoring program described in the DTSC <br /> approved"Final Workplan, Phase III Groundwater Investigation, PG&E Former <br /> Manufactured Gas Plant Site" (Workplan). The Workplan states that the groundwater <br /> monitoring program will be revised as appropriate and that the program will be continued <br /> for two years from the start of Phase IIIc or until the submittal of the Remedial Action <br /> Plan(RAP). Phase IIIc began in January 1994, therefore monitoring is required through <br /> December 1995 or through RAP submittal. <br /> The completion of the Phase III groundwater investigation is an appropriate time to <br /> discuss appropriate revisions to the groundwater monitoring program with your agency. <br /> Because the next quarter sampling must be completed by March 31, 1995, any changes to <br /> the sampling program should be in place by March 15, 1995. Proposed revisions are <br /> described below. <br /> Proposed Approach: <br /> PG&E recommends the following groundwater monitoring program: <br /> • All wells installed during Phase III would be sampled quarterly for one year. The <br /> new wells are MW-1R and MW-18 in Zone A, MW-17 and MW-19 in Zone B, <br /> and MW-14, MW-15 and MW-16 in Zone C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.