Laserfiche WebLink
Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> San Francisco,CA 94120 <br /> 415/973-7000 <br /> Direct Dial 415/973- / �p <br /> Telecopy 415/973-9201 H �.3 <br /> February 23, 1995 0 <br /> James L. Tjosvold, P.E. <br /> Acting Chief, Site Mitigation Branch <br /> r California Environmental Protection Agency <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Re: Docket #HSA 90/91-008 -Proposed Revisions to the Groundwater <br /> Monitoring Program for the Stockton Former Manufactured Gas Plant Site <br /> Pacific Gas and Electric Company(PG&E) proposes to revise the quarterly groundwater <br /> monitoring program at its Stockton Former Manufactured Gas Plant Site. The proposal <br /> includes reducing the sampling frequency of some existing wells installed prior to the <br /> Phase III investigation from the groundwater monitoring program described in the DTSC <br /> approved"Final Workplan, Phase III Groundwater Investigation, PG&E Former <br /> Manufactured Gas Plant Site" (Workplan). The Workplan states that the groundwater <br /> monitoring program will be revised as appropriate and that the program will be continued <br /> for two years from the start of Phase IIIc or until the submittal of the Remedial Action <br /> Plan(RAP). Phase IIIc began in January 1994, therefore monitoring is required through <br /> December 1995 or through RAP submittal. <br /> The completion of the Phase III groundwater investigation is an appropriate time to <br /> discuss appropriate revisions to the groundwater monitoring program with your agency. <br /> Because the next quarter sampling must be completed by March 31, 1995, any changes to <br /> the sampling program should be in place by March 15, 1995. Proposed revisions are <br /> described below. <br /> Proposed Approach: <br /> PG&E recommends the following groundwater monitoring program: <br /> • All wells installed during Phase III would be sampled quarterly for one year. The <br /> new wells are MW-1R and MW-18 in Zone A, MW-17 and MW-19 in Zone B, <br /> and MW-14, MW-15 and MW-16 in Zone C. <br />