Laserfiche WebLink
James L. Tjosvold, P.E. <br /> April 22, 1997 <br /> Page 5 <br /> V. Results of Analyses. Tests or Other Data: <br /> Groundwater sampling was conducted in March, 1997 and the analytical results will be <br /> submitted to DTSC and the RWQCB by April 30, 1997 in the "Quarterly Monitoring Report, <br /> PG&E Stockton Former MGP Site, First Quarter, 1997'. <br /> If you have any questions or require additional information, please call me at (415) 973-6254. <br /> Sincerely, <br /> Patricia Sullivan <br /> Project Manager- Stockton Former Manufactured Gas Plant Site <br /> cc: Mr. James R. Bennett, Interim Executive Officer <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Attention: Ms. Wendy Cohen <br /> Mr. Ron Valinoti, Director <br /> San Joaquin Local Heath District <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> Attention: Ms. Linda Turkatte <br />