Laserfiche WebLink
James L. Tjosvold, P.E. <br /> November 5, 1996 <br /> Page 4 <br /> The next quarterly groundwater monitoring will be conducted in December, 1996. <br /> III. Schedule Changes: <br /> On August 21, 1996, PG&E submitted a revised project schedule which included action items <br /> and agreements reached during the August 8, 1996 meeting. This schedule includes <br /> conducting additional soil borings in Area I, soil borings in Area II and the installation of an <br /> additional Zone B groundwater monitoring well(s). <br /> IV. Activities Planned for Next Quarter: <br /> The installation of soil borings in Areas I and II and the groundwater monitoring well(s) along <br /> the perimeter of Area II will be conducted in December, 1996. Results from this investigation <br /> will be included in the FS. <br /> Work on the combined soil and groundwater FS and on refinement of the VLEACH and <br /> groundwater mixing cell model will continue. <br /> The next quarterly groundwater monitoring will be conducted in December, 1996. <br /> V. Results of Analyses, Tests or Other Data: <br /> Groundwater sampling was conducted in September, 1996 and the analytical results were <br /> submitted to DTSC and the RWQCB on October 31, 1996 in the"Quarterly Monitoring <br /> Report, PG&E Stockton Former MGP Site, Third Quarter, 1996". <br /> If you have any questions or require additional information, please call me at (415) 973-6254. <br /> Sincerely, <br /> Patricia Sullivan <br /> Project Manager Stockton Manufactured Gas Plant Site <br />