My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE IV GROUNDWATER INVESTIGATION RESULTS <br /> STOCKTON FORMER MANUFACTURED GAS PLANT SITE <br /> CH2M HILL. Phase II Supplemental RI Work Plan Area II, PG&E Stockton Former MGP Site. <br /> April, 1992. <br /> CH2M HILL. Final Supplemental Remedial Investigation and Risk Assessment Report,PG&E <br /> Stockton Former MGP Site. August, 1993. <br /> CH2M HILL. Phase III Groundwater Investigation Workplan,PG&E Stockton Former MGP Site. <br /> June, 1993a. <br /> CH2M HILL.Final Phase III Technical Memorandum, PG&E Stockton Former MGP Site. <br /> March 14, 1995. <br /> CH2M HILL. Quarterly Monitoring Report,PG&E Stockton Former MGP Site Third Quarter <br /> 1995. October, 1995a. <br /> CH2M HILL. Draft Soil Operable Unit Feasibility Study,PG&E Former Manufactured Gas Plant <br /> Site,November, 1995b. <br /> CH2M HILL. Workplan Phase IV Groundwater Investigation,PG&E Former Manufactured Gas <br /> Plant Site. February 5, 1996. <br /> DTSC. Letter to Mr.Robert Doss,P.E.,Project Manager,PG&E,from Fernando Amador, <br /> Hazardous Substances Engineer,Department of Toxic Substances Control.March 8, 1995. <br /> Earth Systems Environmental,Inc. Tank Closure Report,Morton Paint Company,38 West <br /> Sonora Street. Stockton,California. 1992. <br /> Sanborn Map Company. Sanborn maps dated 1895, 1917, 1950,1972. <br /> SF0/GAwPROC\110716\P4\002.DOC 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.