Laserfiche WebLink
The range of goals should span between"background" at one <br /> end and"no action" at the other end. After reviewing <br /> information, narrow down the range of achievable goals. <br /> Her expectation is that the RI&FS are interactive, the RI <br /> should not be a distinct phase. <br /> Philip Isorena: Under current policy(92-49),you need to demonstrate that <br /> "background" doesn't work. <br /> Fran Anderson: You can demonstrate that"background"does not work within <br /> the feasibility study. <br /> Bob Doss: As we move through the FS we need to have continuous <br /> agency interaction. <br /> Fran Anderson: Desires frequent meetings during the FS. For the VLEACH <br /> model she would have liked an initial "heads up" on the use of <br /> the model. <br /> Tricia Sullivan: We may need more time for agency interaction during the FS. <br /> Bob Doss/Fran Anderson: Would like the agencies to have more time to look at <br /> drafts and other steps along the way. <br /> Fernando Amador: Need to define and justify the Area I source areas. <br /> Would like criteria for soils which meet the various <br /> groundwater goals <br /> Summary: <br /> Everyone agrees on FS objective, two soil goals, and the range of groundwater goals as <br /> discussed in PG&E's June S, 1996 letter. <br /> 3.0 Agree on DTSC and RWQCB Roles <br /> Questions: <br /> • What is your understanding of agency roles with examples <br /> • Is there room for adjustments so that expectations are met? <br /> Responses: <br /> Fran Anderson: DTSC is the lead agency where lead agency =overall <br /> responsibility for decision making with statutory framework. <br /> 3 <br />