My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The range of goals should span between"background" at one <br /> end and"no action" at the other end. After reviewing <br /> information, narrow down the range of achievable goals. <br /> Her expectation is that the RI&FS are interactive, the RI <br /> should not be a distinct phase. <br /> Philip Isorena: Under current policy(92-49),you need to demonstrate that <br /> "background" doesn't work. <br /> Fran Anderson: You can demonstrate that"background"does not work within <br /> the feasibility study. <br /> Bob Doss: As we move through the FS we need to have continuous <br /> agency interaction. <br /> Fran Anderson: Desires frequent meetings during the FS. For the VLEACH <br /> model she would have liked an initial "heads up" on the use of <br /> the model. <br /> Tricia Sullivan: We may need more time for agency interaction during the FS. <br /> Bob Doss/Fran Anderson: Would like the agencies to have more time to look at <br /> drafts and other steps along the way. <br /> Fernando Amador: Need to define and justify the Area I source areas. <br /> Would like criteria for soils which meet the various <br /> groundwater goals <br /> Summary: <br /> Everyone agrees on FS objective, two soil goals, and the range of groundwater goals as <br /> discussed in PG&E's June S, 1996 letter. <br /> 3.0 Agree on DTSC and RWQCB Roles <br /> Questions: <br /> • What is your understanding of agency roles with examples <br /> • Is there room for adjustments so that expectations are met? <br /> Responses: <br /> Fran Anderson: DTSC is the lead agency where lead agency =overall <br /> responsibility for decision making with statutory framework. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.