My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l� <br /> Pacific Gas and Electric Company „j4 ntal Services <br /> WA A, HEALTH <br /> I <br /> S OFOGSWOR <br /> 415/973-7000 <br /> 1e{15/ <br /> August 7, 1996 9eA$c�415/9 2P 33 <br /> James L. Tjosvold, P.E. <br /> Chief, Site Mitigation Branch <br /> California Environmental Protection Agency <br /> Department of Toxic Substances Control <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Docket#HSA 90/91-08 - Stockton Former Manufactured Gas Plant Site <br /> Responses to Comments on the Phase IV Groundwater Investigation Report <br /> Enclosed are PG&E's responses to DTSC and RWQCB (the agencies) comments on the <br /> Phase IV Groundwater Investigation Report(Phase IV Report) for the Stockton former <br /> manufactured gas plant(MGP) site. The soil OUFS report was submitted to the agencies on <br /> June 10, 1996. A conference call took place on June 24, 1996 during which the results and <br /> conclusions from the Phase IV investigation were discussed. Agency comments on the Phase <br /> IV report, dated July 9, 1996 were received on July 15, 1996. The following responses serve <br /> to finalize the Phase IV report and as such, should be attached to the June 10, 1996 report. <br /> The agency comments are italicized and presented before each response. <br /> Responses to DTSC comments (dated July 9, 1996): <br /> Comment: <br /> 1. The Report is missing a signature page showing who at CH2MHill prepared and <br /> approved the document. Please be aware that all final technical workplans and reports must <br /> also be signed and stamped by a registered Engineer or Geologist (as appropriate) <br /> registered in California. <br /> Response: <br /> 1. Enclosed for insertion into the Phase IV report is a signature page which carries the seal, <br /> registration expiration date, and signature of Thomas M. Little, a California Registered <br /> Geologist employed by CH2M HILL. <br /> Comment: <br /> 2. Conclusions made in Section 4.0 must discuss the level offulflllment ofgoals and <br /> objectives, remaining data gaps and options for addressing data gaps and meeting goals. All <br />
The URL can be used to link to this page
Your browser does not support the video tag.