My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Schedule(As Amended March 8, 19961 <br /> Stockton Former MCP Site <br /> Activit <br /> Ot;ce/Comment period begins Schedule' <br /> ¢rin8 <br /> 2 weeks after Fact Sheet ,,,;,tied Original Scheduled <br /> p rG 5 period ends Approximately IS dnyti aur, I`oblic Notice 5/2ate' a <br /> IO �fI d pI response to public comments and final 30 days III I "l„ Date <br /> 'nal Soil Y Nutiec 6/5/95 1/6/97 <br /> yds a ubtrtiltal to DTSC 4 weeks rifles co,n,n,•,n t+c riod ends <br /> 5GQ 5 "s of groundwater level monitoring 6/22/95 1/21/97 <br /> rz row of phase IV Work Plan 4 weeks after completion of groundwater level 7/20/95 3/5/97 <br />;f}_ -Jc�.0eeting to discuss comments on Work Plan 2 Weeks after submittal of Phase IV Work <br /> -l� -2 wccks mitt n c ncy meelinl,ork Plan ..; N/A <br /> to c >' cif final Phase IV Work Plan 1 week after submittal of lianl Phase 1 V N/A 3/95'12/95 <br /> eryn royal of final Phase IV Work Plan '' <br />�e e�° Site access Work Plan N/A 1/8/96 <br /> �btt+t�nase IV fieldwork 2 weeks alter agency approval of final P N/A 1/22/96 <br /> Phase---IV Work Plan N/A 2/5/96 <br /> to Phase IV fieldwork 2 Weeks nl'Icr elle access obtained <br /> c�c�Ate i 6 weeks after Phase 1 V N/A 2/22/96 <br /> G it echn cal Memorandum "atm<late 3/14/96 <br /> obit tweeting to discuss Phase TV Technical Memorandum and 6 weeks after receipt of Phase iv at tical results N/A 3/18 <br /> c 2 weeks after submittal of Memo andunt N/A 4 /96 <br /> $ ew y• Stud <br /> P. alvih�:5p' o �".,, -.. -`--•.� dum comn,cat, <br /> Delivery of draft groundwater FS report 2 weeks after a N/A /29/96 <br /> agency meeting N/A 6/10/96 <br /> Agency comments back 6 weeks after PG&li response to A 6/24/96 <br /> Delivery of final Groundwater FS report 4 weeks after delivery of FS to ase IV Memorandnrtt N/A <br /> A enc a royal of Groundwater FS re ort 4 weeks after receipt of agent agency N/A 7/8/96 <br /> of agency draft Groundwater RAP 2 weeks after recei t of final Snents N/A 8/19/96 <br /> Delivery N/A 9/16/96 <br /> Agency comments back 12 weeks after approval of F <br /> of final draft Groundwater RAP and draft Fact Sheet 4 Weeks after delivery of RAP S N/A 10/14/96 <br /> Delivery 4 weeks after receipt to agency N/A 10/28/96 <br /> A enc a royal of draft Groundwater RAP and draft Fact Sheet pt of agency comments N/A <br /> pact Sheet on Groundwater RAP mailed 2 weeks after recei t of final en co P <br /> 2 weeks after a enc act Sheet 1/20/97 <br /> Public Notice/Cnmment period begins g Y approval of draft RAp/p N/A 217/97 <br /> Public Hearing <br /> 2 weeks after agency approval of act Sheet N/A 3/17/97 <br /> Comments Period ends Approximately IS days after Publieact Sheet N/,4 3/31/97 <br /> D'I'SC and PG&E response to public comments and Final 30 days after Public Notice Nonce N/A 4/14/97 <br /> Groundwater RAP submittal to DTSC 4 weeks after Comment period ends N/A4�8�7 <br /> N/A 5/13/97 <br /> N/A 5/28/97 <br /> I. Based on approved schedule of August 23, 1993 2. Based on actual completion dates or estimates as of 6/25/97 <br /> March 8,1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.