My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric. Company Environmental Services �A1L NEALTfI <br /> P.O.Box 7640 ENVIh?OKMEN <br /> San Francisco,CA 9412P�=F�;A!I SERVICE <br /> 415/973-7000 <br /> Direct Dial 415/971§ JUL —8 AM 11: 18 <br /> July 2, 1996 Telecopy 415/973- 1 <br /> Ms. Fran Anderson <br /> Senior Waste Management Engineer <br /> California Environmental Protection Agency <br /> r qyDepartment of Toxic Substances Control <br /> C� 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Dear Ms. Anderson: <br /> Re: Docket#HSA 90/91-08 - Stockton Former Manufactured Gas Plant Site <br /> Subject: Meeting Minutes from June 24, 1996 Conference Call <br /> Enclosed are meeting minutes from a June 24, 1996 conference call between Pacific Gas <br /> and Electric Company (PG&E), CH2M Hill, the Department of Toxic Substances Control <br /> (DTSC) and the Central Valley Regional Water Quality Control Board (RWQCB), <br /> prepared by CH2M Hill. During the conference call, the Phase IV groundwater <br /> investigation results and the draft Feasibility Study approach were discussed. <br /> If you have any comment or questions, please call me at (415) 973-6254. <br /> Sincerely, <br /> J <br /> Patricia Sullivan <br /> Stockton Manufactured Gas Plant Site Project Manager <br /> cc: Phillip Isorena <br /> Associate Water Resource Control Engineer <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br />
The URL can be used to link to this page
Your browser does not support the video tag.