My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CH2M HILL <br /> 1111 Broadway <br /> P.O.Boz 12681 <br /> Oakland,CA <br /> ® CH2MHILL 94604-2681 <br /> Tel 510.251.2426 <br /> Fax 510.893.8205 <br /> July 1, 1996 <br /> Ms. Patricia Sullivan <br /> Environmental Services Department <br /> Pacific Gas and Electric Company <br /> P.O. Box 7640 <br /> San Francisco,CA 94120 <br /> Dear Ms. Sullivan: <br /> Re: Docket#HSA 90/91-08-Stockton Former Manufactured Gas Plant Site <br /> Subject: Meeting Minutes from Conference Call,June 24,1996 <br /> The following summarizes the major topics we discussed during the conference <br /> call/meeting on June 24, 1996. The attendees were Patricia Sullivan of PG&E;Fran <br /> Anderson and Fernando Amador of DTSC;Philip Isorena of the RWQCB;and Paula Bolio <br /> and Nancy Hendrickson of CH2M HILL. The meeting agenda is enclosed with this letter. <br /> 1.0 Objectives <br /> a. Paula Bolio reviewed the objectives of this meeting. They were to 1)discuss <br /> and agree on the Phase IV groundwater investigation results and 2) discuss <br /> and agree on the feasibility study(FS)approach and schedule described in <br /> PG&E's letter to the agencies,dated June 6,1996. <br /> 2.0 Phase IV Groundwater Investigation <br /> a. Paula Bolio reviewed the purpose of,and the work completed during the <br /> Phase IV groundwater investigation. Six wells were installed and sampled <br /> for the purpose of finding the extent of PNAs and benzene in groundwater <br /> Zones A,B,and C.Wells MW-20 and MW-21 were installed in Zone A,MW- <br /> 22 and MW-23R were installed in Zone B, and MW-24 and MW-25 were <br /> installed in Zone C. <br /> b. Paula Bolio reviewed the results of the investigation. Groundwater contour <br /> maps and PNA and benzene isoconcentration maps were presented. The <br /> Zone A and C wells were installed in the planned locations and groundwater <br /> sample results indicated the extent of PNAs is limited to Area I of the site. <br /> The two new Zone B wells were installed close to their planned locations <br />
The URL can be used to link to this page
Your browser does not support the video tag.