My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Patricia Sullivan <br /> Page 4 <br /> July 1, 1996 <br /> b. Patricia presented the FS schedule and reiterated the need for agency <br /> participation during the FS process so that we could minimize further <br /> iterations of the FS. Fran said it was a good idea to include the agencies in <br /> the screening process. <br /> 4.0 Wrap Up/Action Items <br /> a. The following agreements were reached with respect to the Phase IV <br /> investigation: <br /> 1. The Phase IV groundwater investigation report would be finalized after <br /> PG&E receives comments from DTSC,and this would include PG&E's <br /> assumed nondetect line for Zone B for the purpose of compiling the FS. <br /> 2. Groundwater monitoring would continue during the FS and RAP process, <br /> and 3.The feasibility study would proceed as planned. <br /> b. It was agreed that the FS approach as outlined in PG&E's June 6, 1996 letter <br /> was acceptable for PG&E to follow and that the schedule would resume after <br /> PG&E receives written agreement from DTSC regarding the FS approach. <br /> C. Paula Bolio said that she would prepare and distribute meeting minutes from <br /> this conference call. <br /> d. Philip said that he would send Nancy/ Patricia information on <br /> -Port of Stockton site(s),McCormick and Baxter and other nearby <br /> environmental sites <br /> -UST sites,SLIC list etc <br /> -Mather Air Force Base,to provide an example of a RWQCB technical and <br /> economic feasibility approach and whether nondetect is considered an ARAR <br /> e. Paula said that CH2M HILL would send information to everyone concerning <br /> PNAs in diesel. <br /> If you have any questions or comments on the enclosed,please call me at(510)251-2888, <br /> extension 2248. <br />
The URL can be used to link to this page
Your browser does not support the video tag.