Laserfiche WebLink
James L. Tjosvold, P.E. <br /> April 24, 1996 <br /> Page 4 <br /> A draft technical memorandum describing the installation of six new groundwater <br /> monitoring wells at the site will be submitted for DTSC and RWQCB review on June 17, <br /> 1996. <br /> The results of quarterly groundwater monitoring done in March, 1996 will be submitted to <br /> the agencies by April 30, 1996 in the"Quarterly Monitoring Report, PG&E Stockton <br /> Former MGP Site, First Quarter 1996". <br /> The next quarterly groundwater monitoring will be conducted in June, 1996. <br /> V. Results of Analyses, Tests or Other Data: <br /> Groundwater sampling was conducted in March, 1995 and the analytical results will be <br /> submitted to DTSC and the RWQCB by April 30, 1996 in the"Quarterly Monitoring <br /> Report, PG&E Stockton Former MGP Site, First Quarter, 1996". <br /> If you have any questions or require additional information, please call me at (415) 973- <br /> 6254. <br /> Sincerely, <br /> Patricia Sullivan <br /> Project Manager Stockton Manufactured Gas Plant Site <br />