My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l - <br /> Pacific Gas and Electric Company Environmental Services -11-AL HEALTH <br /> P.O.Box 7640 F. <br /> San Francisco,CA 94120 r! <br /> 415/973-7000 <br /> Direct Dial 415/973- c IS FEB -7 AM 9: 19 <br /> February 6, 1996 Telecopy 415/973-9201 <br /> James L. Tjosvold, P.E. <br /> Acting Chief, Site Mitigation Branch <br /> California Environmental Protection Agency <br /> r Department of Toxic Substances Control <br /> 10 15 1 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Re: Docket No. HSA 90/91-08 - Stockton Former Manufactured Gas Plant Site <br /> Subject: Submittal of Final Phase IV Groundwater Investigation Workplan <br /> Enclosed for your approval are two copies of Pacific Gas and Electric Company's <br /> (PG&E's) "Final Workplan, Phase IV Groundwater Investigation, PG&E Former <br /> Manufactured Gas Plant Site, 535 Center Street, Stockton, California". This Workplan <br /> is for the installation of six new downgradient groundwater monitoring wells at PG&E's <br /> Stockton site. Two wells will be installed in Zone A, two wells will be installed in Zone <br /> B and two wells will be installed in Zone C. The installation of these additional <br /> groundwater wells was agreed upon during a February 28, 1995 meeting between <br /> PG&E, the Department of Toxic Substances Control (DTSC) and the California <br /> Regional Water Quality Control Board (RWQCB). This final Workplan incorporates <br /> comments received from DTSC and RWQCB on the draft Workplan submitted to you <br /> on January 8, 1996. <br /> If you have any questions or require additional information, please call me at(415) 973- <br /> 6254. <br /> Sincerely, <br /> Patricia Sullivan <br />
The URL can be used to link to this page
Your browser does not support the video tag.