Laserfiche WebLink
Taber <br /> Since 1954 <br /> Statement of Work <br /> The project involves improvements to the PG&E properly that is bounded <br /> by Church Street (on the north), EI Dorado Street (on the east), E. Hazelton <br /> Avenue (on the south), and S. Center Street (on the west) in Stockton, California <br /> Drilling, sampling and logging will take place after clearance of USA, <br /> acquisition of permits and utility locating within the parcel. One drilled and <br /> sampled hole will be completed to 40-ft depth and three CPT (Cone <br /> Penetrometer) holes to 40-ft depth. The borehole will be drilled using hollow <br /> stem auger using environmental protocols (including steam cleaning of sampling <br /> equipment). Sampling will be every 3-ft for the first 15-ft and then at 5-ft <br /> intervals thereafter. The boring and the CPT holes will be tremie backfilled with <br /> neat cement to total depth, at completion. <br /> This project is not a Phase II; no wells will be installed during this project. <br />