My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:18:36 PM
Creation date
2/25/2019 2:44:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Taber <br /> Since 1954 <br /> Statement of Work <br /> The project involves improvements to the PG&E properly that is bounded <br /> by Church Street (on the north), EI Dorado Street (on the east), E. Hazelton <br /> Avenue (on the south), and S. Center Street (on the west) in Stockton, California <br /> Drilling, sampling and logging will take place after clearance of USA, <br /> acquisition of permits and utility locating within the parcel. One drilled and <br /> sampled hole will be completed to 40-ft depth and three CPT (Cone <br /> Penetrometer) holes to 40-ft depth. The borehole will be drilled using hollow <br /> stem auger using environmental protocols (including steam cleaning of sampling <br /> equipment). Sampling will be every 3-ft for the first 15-ft and then at 5-ft <br /> intervals thereafter. The boring and the CPT holes will be tremie backfilled with <br /> neat cement to total depth, at completion. <br /> This project is not a Phase II; no wells will be installed during this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.