My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:18:36 PM
Creation date
2/25/2019 2:44:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> (Continued) <br /> 5.1.3 Level C and Level C (Modified)........................................................................ 16 <br /> 5.1.4 Level B and Level A ......................................................................................... 16 <br /> 5.2 LEVEL OF PROTECTION REQUIRED FOR SPECIFIC TASKS .............................................. 16 <br /> 6.0 WORK ZONES AND SECURITY MEASURES........................................................... 17 <br /> 6.1 SITE SECURITY.......................................................................................................... 17 <br /> 6.2 WORK ZONES............................................................................................................ 17 <br /> 7.0 DECONTAMINATION PROCEDURES....................................................................... 19 <br /> 7.1 PERSONNEL DECONTAMINATION ................................................................................. 19 <br /> 7.2 EQUIPMENT DECONTAMINATION.................................................................................. 19 <br /> 7.2.1 Hand Auger and Sampling Equipment............................................................. 19 <br /> 7.2.2 Heavy Equipment............................................................................................. 20 <br /> 7.3 DISPOSAL OF DECONTAMINATION WASTES ..................................................................20 <br /> 8.0 CONTINGENCY PLAN ...............................................................................................21 <br /> 8.1 GENERAL..................................................................................................................21 <br /> 8.2 FIELD AUDITS/INSPECTIONS........................................................................................22 <br /> 8.2.1 Corrective Action.............................................................................................. 22 <br /> 9.0 DECONTAMINATION MEASURES............................................................................23 <br /> 9.1 GENERAL..................................................................................................................23 <br /> 9.2 DECONTAMINATION DURING EMERGENCIES..................................................................24 <br /> 9.3 PHYSICAL INJURY ......................................................................................................24 <br /> 9.4 CHEMICAL EXPOSURE................................................................................................24 <br /> 9.5 EMERGENCY COMMUNICATIONS..................................................................................24 <br /> 10.0 SANITATION PROVISIONS .......................................................................................26 <br /> 11.0 ACKNOWLEDGEMENT.............................................................................................27 <br /> LIST OF TABLES <br /> Table 1 Action Levels and Action to Be Taken <br /> Table 2 List of Emergency Numbers <br /> LIST OF FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Hospital Location Map <br /> ENV~ III February 2005 <br /> A M E R I C A P:\PG&E\PGE-05-01 Stockton MW26R Investigation\MW26 Work Plan\H&S\H&S Plan-2005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.