Laserfiche WebLink
'°mac°� SAKJOAQUIN Environmental Health Department <br /> Z <br /> N COU NTY <br /> Linda Turkatte, REHS, Director <br /> gcrao � Greatness grows here. FILEKasey Foley,REHS,Assistant Director <br /> P Y <br /> PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> Rodney Estrada,REHS <br /> Willy Ng,REHS <br /> August 17, 2017 Muniappa Naidu,REHS <br /> Ms. Karli Karns <br /> Confidence UST Services, Inc. <br /> 16250 Meacham Road <br /> Bakersfield, CA 93314 <br /> Re: ARP Mini Mart Amended SR0077233 <br /> 25775 Patterson Pass Road <br /> Tracy, CA 95377 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application to amend the existing permit to replace all four dispensers with new Gilbarco <br /> Encore 700 3+0 dispensers and install four new Bravo CONV B2000 under dispenser <br /> containment (UDC) dispenser conversion frames on the underground storage tank (UST) <br /> system at the above noted address. The amended permit includes demolition of the existing <br /> canopy and installation of a new canopy, repair leaks in the UDCs, and installation of new Bravo <br /> CONY-RETROFIT-PLATE-KITs in UDCs 1-2 and 5-6. The amended permit has been approved <br /> with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Vicki McCartney at (209) 468-9852 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> pproval. <br /> a. Verification of conversion frame installations per the manufacturer's installation <br /> / instructions. <br /> Verification of conversion retrofit plate kit installations in UDCs 1-2 and 5-6 per the <br /> manufacturer's installation instructions. <br /> Verification of the dispenser footprints contained by the UDC sumps and verification <br /> that all potential product piping leaks will be captured in the UDC. / <br /> Visual inspection of the piping within the dispensers for any product leaks`./ <br />