My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:13:59 PM
Creation date
2/26/2019 12:07:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION MATERIALS CHECKLIST <br />Tools & equipment F-1 Offsets, elbows, nipples, unions, Etc.. <br />Concrete anchor bolts * F-1 Plastic caps (sow plugs) for nuts / bolts <br />El Dispenser anchor bolts <br />* S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames, <br />PRE -INSTALLATION CHECKLIST <br />❑ Ensure that you have all your permits in order, including your Bravo Certification Card. <br />Conversion Frame is free of damage? <br />Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br />If either of the two scenarios below exist, call Bravo immediately at 323-888-4133 . <br />> The existing conduits are concreted in just outside the water splash lip. <br />> The existing conduits run vertically very close to the UDC's water splash lip or I.D. opening. <br />INSTALLATION CHECKLIST <br />❑ Dispenser was carefully removed and any spills contained and cleaned up? <br />Drawings for all components are on-site and have been reviewed for any problems? <br />E7 Conversion Frame is bolted to the island or concrete with minimum 1/2"o bolts? <br />If a non -Bravo UDC is existing, were a minimum of 4 either existing or new anchor bolts <br />used to secure the conversion frame to the concrete? <br />All electrical conduits are adjusted correctly to mate with the new dispenser? <br />All product inlets are pre -plumbed with approved offsets, elbows, pipe, etc..? <br />Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br />Conversion Frame was inspected for dents or damage? <br />4 ii -CONY -B2000 -Conversion Frame -14A - 8/20/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.