My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:13:59 PM
Creation date
2/26/2019 12:07:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o%i q 7 UPc7 has successfully completed <br />Bonder Tran ling as set fortif in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products. <br />( <br />IJj Red Thread IIA Ull 3000L i3000LCX <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been practiced for a period of 6 months. <br />Fiber Glass S stems <br />r�Mpfi2�7- has successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products. <br />IJ Red Thread IIA &13000L U 3000LCX r l5 <br />Primary and Secondary Containment Systems Efate <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been practiced for a period of 6 months. <br />Fiber Glass Systemic, <br />t-ranK L Wda has successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products. <br />CdRed Thread IIA �3000L IJ' 3000LCX t 3 <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been practiced fora period of 6 months. <br />m; <br />Ghap I has successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products. <br />12 <br />IdRed Thread IIA 3000L 3000LCX 3 <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been practiced fora period of 6 months. <br />JUN 08 2017 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.