My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> A) LEVELING AND CUT-DOW1NN DEC 05 2017 <br /> s IZONMENTAL IIEAI.TII <br /> y ) �c�reae�g ad <br /> A.1 g Determine where the concrete rade will be and an island elevations. Run <br /> line or other means of elevation measurement and reference. <br /> r DO NOT PLACE SUMPS ON ANY RIGID SURFACE DURING <br /> LEVELING INSTALLATION OR CONCRETE POURING. <br /> IF NOT CUTTING DOWN HEIGHT IN THE FIELD: SKIP TO STEP A.4 <br /> IF YOU WILL NEED TO CUT DOWN SUMP HEIGHT: PROCEED TO STEP A.2 <br /> A.2) You may need to adjust the sump's overall height before hanging and/or securing it for <br /> entry fitting installation and piping.The B-1000 series features graduation marks on both ends and <br /> a label indicating inches of height. Use this guide to help quickly determine how tall each sump needs <br /> to be. Similarly to a polyethylene UDC, you must cut-down the neck to change the height of the sump. <br /> The Anchor Frame hangs on hooks from the top edge of the UDC. BE CAREFUL not to cut the neck <br /> down so much that the frame can not hang from the top cut edge. When you have determined how <br /> much you need to cut from each sump, if at all, proceed to cut them square across the top. <br /> A.3) SKIP THIS STEP IF YOU DID NOT CUT THE SUMP's HEIGHT. If the sump was cut down, you <br /> need to remove the C-Channel and anchoring bars on the sides of the UDC. You can not leave the <br /> bracketing in place where it was originally installed. After the top edge is cut square, simply set the <br /> steel frame over the neck, level it and make sure all the hanging hooks are in contact(Fig.A.3a). Using <br /> the holes in this frame as a template, drill new holes through the neck of the sump on both sides. When <br /> all holes have been drilled, install each C-channel bar through the inside holes and fasten on the <br /> outside (Fig. A.3b). <br /> OPTIONAL: Sealing the Anchor Bars. You can seal the bars and bolts to the sump wall with <br /> a sealant (Fig. A.3b). Tremco brand Vulkem 116 (polyurethane sealant) is factory recommended. <br /> • Fig. A.3b <br /> SUMP NECK > < FRAME <br /> Pw <br /> NUT <br /> OPTIONAL <br /> SEALANT <br /> HANGING HERE <br /> HOOKS " EXTERIOR <br /> 3 ii-131000-1313 <br />
The URL can be used to link to this page
Your browser does not support the video tag.