My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADHESIVES <br />For secondary contairnTient systems conveying alcohols or <br />alcohol/gasoline blends, use 8000 or 7000 series adhesive. <br />Follow the adhesive mixing instructions that are packaged with <br />each kit. <br />Refer to page 7 for infomnation on adhesive labeling. <br />ADHESIVE MIXING <br />When the weather is cool or ti -re adhesive has been stored in <br />a cool environment (below 650F), pre -warm the adhesive kits. <br />(Do not heat above 100°F) <br />Empty all of the contents of the hardener. Never attempt <br />to split a kit. Cut through the adhesive with the edge of <br />the mixing stick to assist in mixing the two components. <br />Mix until the adhesive has a uniform color and a consistent <br />flow off the mixing stick. Wipe down the sides, bottom, <br />and under the rim of the can with the mixing stick to assure <br />complete mixture. <br />FILLER MUST BE ADDED TO THICKEN THE ADHESIVE. <br />The filler is packaged in pre -measured quantities for use <br />with 7014 or 8014 and 7069 or 8069 adhesive kits. One <br />bag of filler is used for each adhesive kit. Before adding <br />the filler to the mixed adhesive, be sure both the adhesive <br />base and hardener are thoroughly mixed together. All <br />of the filler in the bag should be used. The thickened <br />adhesive may be applied with either the brush or the stir <br />stick provided in the kit. <br />Refer to Table below for the number of adhesive kits required <br />to bond containment fittings. <br />TABLE 13. Adhesive Kits Per Containment Fitting <br />Type <br />Fitting <br />7069 or 8069" <br />(Kits per Fitting) <br />,t,. 4., 6" <br />90° Elbow <br />I I 1 5 <br />450 Elbow <br />1 1 1 5 <br />Tee <br />I 1 5 2 <br />Coupling <br />1 1 1 5 <br />Termination Fitting <br />i 1 17' <br />of 7014 or 8014 adhesive kits are used for secondary contain <br />ment, increase the number of kits in Table 13 by 50%. <br />Apply adhesive to <br />both halves and <br />to pipe (1 /16" min. <br />thickness) <br />r � _. <br />Pipe must fit snugly <br />into fitting socket so <br />that no gap exists <br />Assemble the containment fitting by Placing the half with the <br />pre-installed threaded female inserts on the bottom. Do not <br />insert pipe past scarfed area. <br />Inserts must be used on 3" and 4" 901 elbows and tees for <br />Closed Interstitial Monitored Systems. inserts are not required <br />for Open Gravity Flow Systems. Prior to bonding the insert, <br />spread the insert splice 3 or 4 times to relax the insert. The <br />insert may be placed on the containment pipe or primary fitting <br />for easy access prior to bonding of the containment fitting. <br />Locate the inserts next to the inside radius of the containment <br />fitting, as shown on drawing below. The split in the insert must <br />be facing up. Do not allow insert to overlap itself. <br />Number of adhesive kits per containment fitting is based on Use the bolts supplied with the clam shell fitting to assemble <br />applying a 1/16" (1.6 mm) minimum thickness of adhesive to the fittings on the pipe. Use of an air or electric wrench with a <br />both halves of the fitting and to the pipe ends. magnetic socket will greatly facilitate assembly. When starting <br />the bolts, allow the bolt to start with minimal pressure on the <br />Complete information and safety precautions are packaged tool. Excessive pressure may push the insert from the fitting. <br />with each adhesive kit. Review all safety precautions thor- Tighten the bolts alternately and with equal force. Do not <br />oughly before mixing the adhesive. exoeed 8 ft•lbs of torque. <br />Adhesive Disposal - See page 6 for instruotions. <br />JOINT ASSEMBLY FOR RED THREAD IIA <br />SECONDARY CONTAINMENT PIPING <br />After cleaning the inside surfaces (I.D.) of both halves of the <br />two-piece fitting, apply a thick coating (1/16"/1.6 rrim minimum <br />of filled adhesive to the entire I.D. of both halves of the fitting. <br />including the flanges (flat bonding surfaces). Next apply a thick <br />coating (1/16"/1.6 mm minimum) of adhesive to the scarfed or <br />sanded surfaces of the pipe ends. <br />NOTE: Prior to bonding, make sure the pipe fits snugly into <br />the socket ends of the two-piece fittings and there are no gaps <br />between pipe ends and fitting sockets. A properly bonded joint <br />should have adhesive visible from all bonded surfaces. <br />NOTE: Do not disturb a completed containment piping joint <br />when assembling additional joints. The adhesive must be fully <br />cured before applying stress to the assembled joints. Read <br />and observe the filled adhesive Instructions supplied with each <br />adhesive kit. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.