My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS - OZONE PILOT TEST & SEMI-ANNUAL GROUNDWATER MONITORING REPORT - THIRD QUARTER 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1201
>
2900 - Site Mitigation Program
>
PR0542081
>
ARCHIVED REPORTS - OZONE PILOT TEST & SEMI-ANNUAL GROUNDWATER MONITORING REPORT - THIRD QUARTER 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 9:53:41 AM
Creation date
2/27/2019 9:21:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
- OZONE PILOT TEST & SEMI-ANNUAL GROUNDWATER MONITORING REPORT - THIRD QUARTER 2014
RECORD_ID
PR0542081
PE
2960
FACILITY_ID
FA0024165
FACILITY_NAME
FERNANDO'S PLACE
STREET_NUMBER
1201
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14716003
CURRENT_STATUS
01
SITE_LOCATION
1201 S CENTER ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM ORDER NO. R5-2011-XXX 7 <br /> ' FERNANDO'S-STOCKTON <br /> SAN JOAQUIN COUNTY <br /> ' d) pollutant concentration maps for all groundwater zones <br /> e) cumulative data tables containing the water quality analytical results and depth to <br /> groundwater <br /> ' f) a copy of the laboratory analytical data report, which may be submitted in an electronic <br /> format <br /> g) the status of any ongoing remediation, including an estimate of the cumulative mass of <br /> ' pollutant removed from the subsurface, system operating time, the effectiveness of the <br /> remediation system, and any field notes pertaining to the operation and maintenance of <br /> the system <br /> t h) if applicable, the reasons for and duration of all interruptions in the operation of any <br /> remediation system, and actions planned or taken to correct and prevent interruptions <br /> i) tabular and graphical summaries of all data obtained during the year <br /> t j) groundwater contour maps and pollutant concentration maps containing all data obtained <br /> during the previous year <br /> k) a discussion of the long-term trends in the concentrations of the pollutants in the <br /> ' groundwater monitoring wells <br /> 1) an analysis of whether the pollutant plume is being effectively treated <br /> m) a description of all remedial activities conducted during the year, an analysis of their <br /> ' effectiveness in removing the pollutants, and plans to improve remediation system <br /> effectiveness <br /> n) an identification of any data gaps and potential deficiencies/redundancies in the <br /> ' monitoring system or reporting program <br /> o) desired, a proposal and rationale for any revisions to the groundwater sampling plan <br /> frequency and/or list of analytes. <br /> ' 8. A letter transmitting the monitoring reports shall accompany each report. Such a letter shall <br /> include a discussion of requirement violations found during the reporting period, and actions <br /> taken or planned for correcting noted violations, such as operation or facility modifications. <br /> If the Discharger has previously submitted a report describing corrective actions and/or a <br /> time schedule for implementing the corrective actions, reference to the previous <br /> correspondence will be satisfactory. The transmittal letter shall contain the penalty of <br /> perjury statement by the Discharger, or the Discharger's authorized agent, as described in <br /> the Standard Provisions General Reporting Requirements Section B.3. <br /> The Discharger shall implement the above monitoring program on the first day of the month <br /> ' following adoption of this Order. <br /> ' Ordered by: <br /> Executive Officer <br /> ' (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.