My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS - OZONE PILOT TEST & SEMI-ANNUAL GROUNDWATER MONITORING REPORT - THIRD QUARTER 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1201
>
2900 - Site Mitigation Program
>
PR0542081
>
ARCHIVED REPORTS - OZONE PILOT TEST & SEMI-ANNUAL GROUNDWATER MONITORING REPORT - THIRD QUARTER 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 9:53:41 AM
Creation date
2/27/2019 9:21:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
- OZONE PILOT TEST & SEMI-ANNUAL GROUNDWATER MONITORING REPORT - THIRD QUARTER 2014
RECORD_ID
PR0542081
PE
2960
FACILITY_ID
FA0024165
FACILITY_NAME
FERNANDO'S PLACE
STREET_NUMBER
1201
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14716003
CURRENT_STATUS
01
SITE_LOCATION
1201 S CENTER ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> 0 <br /> n C1 u i e <br /> 1 <br /> 1280 N Red Gum Street Anaheim,CA 92806. 714-632-1400 <br /> Mako Industries 3-Pound Ozone Injection System <br /> Y <br /> ' Get a QUOTE >> <br /> Standard Features: <br /> • Small Footprint Cabinet Mounting <br /> • 3 Pound / Day Ozone Delivery <br /> • 94% Pure Oxygen Production <br /> • Cooled Air Ozone Production <br /> ars <br /> • 100 PSI Delivery Capability <br /> • Ambient Ozone Monitoring � <br /> • 20 Point Delivery System <br /> • Adjustable Well Timers <br /> • Adjustable Ozone Production <br /> • External Pressure Gauge <br /> ' • External Flow Regulator <br /> • 8 CFM Breakthrough Compressor <br /> • Total Air Flow Filtration System <br /> • Total Water Removal System <br /> • Digital Operator Interface <br /> 1 <br /> 1 <br /> Standard <br /> Op tions: <br /> ' Air Conditioner Cooling System <br /> Oxidation Points <br /> Remote Telemetry <br /> Totally Enclosed Trailer Mounting <br /> ' Standard Performance Specifications: <br /> Skid Dimensions = 4' Width x 2' Depth x 6' Height <br /> Heavy Duty Construction Throughout <br /> Electrical Requirement = 120 Volt/1 Phase/40 Amp <br /> ' Process Flow = 8 CFM and up to 100 PSI <br /> Ozone Production = Up To 3 Pounds / Day <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.