Laserfiche WebLink
San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton, California 95202-3029 <br />Website: WWW.Sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209)464=0138 <br />12 June 2009 <br />Messrs. Robert Trommer, CHG, and Kirk Larson, PG <br />State Water Resources Control Board <br />Division of Financial Assistance <br />1001 1 Street <br />Sacramento CA 95814 <br />Subject: EHD Comments on Annual Five -Year Review Various Sites <br />DIRECTOR <br />Donna Heran. REHS <br />ASSISTANT DIRECTOR <br />Laurie Cotulla, REHS <br />PROGRAM COORDINATORS <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Robert McClellon, REHS <br />JefF Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br />your draft 5 -year review updates on numerous sites and is providing comments on the following <br />sites: <br />• 1201 S. Center Street, Stockton <br />• 300 S. California Street, Stockton, <br />• 1250 N. Wilson Way, Stockton, <br />• 2662 N. Wilson Way, Stockton; <br />• 2151 Country Club Boulevard, Stockton <br />EHD comments on other sites may be issued at a later time; the EHD comments on the above <br />listed sites are as follows: <br />1201 S. Center Street - In your draft letter you recommend that the EHD direct the responsible <br />Party (RP) to reduce monitoring and focus remaining resources on remediation. The EHD <br />agrees with these recommendations; a directive letter is in preparation significantly reducing the <br />sampling/analytical requirements. The responsible party and his consultant state that the delay <br />n reimbursements from the State Board Cleanup Fund (CUF) is impeding their ability to start <br />remediation. SVE wells have been installed, but trenching is needed to plumb them to an SVE <br />unit. The EHD s scheduling a meeting with the RP to set timetables for bringing his site into <br />remediation. <br />300 S. California Street —Your draft letter recommends the EHD direct the RP to assess <br />groundwater remedial technologies to more rapidly achieve water quality goals (WQOs). The <br />EHD has met with the RP and their consultant; both claim economic hardship due to the delay <br />n reimbursements from the CUF, which is impeding their ability to maintain the current system. <br />The groundwater extraction rate has been maximized, but further increase in the rate will <br />exceed the RP's disposal permit and significantly increase disposal costs. <br />1250 S. <br />Wilson <br />Way —Your <br />draft letter continues to recommend the EHD to direct the RP to <br />assess <br />remedial <br />groundwater <br />technologies and implement active remediation to achieve WQOs <br />5 -Year Review Comment Letter B 0609.doc <br />