Laserfiche WebLink
ATC SUE SAFETY PLAN <br /> On-site communications: ❑ Radio ®Verbal ❑Hand Signals <br /> ❑Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio 8 Telephone <br /> ❑Other <br /> The specific signal for an emergency.is: VerbalivGiven <br /> The specific signal for an evacuation is: Verbally iven <br /> Evacuation assembly point is: To be determine J on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTE{S} ON SITE MAP L7 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective a ui ment <br /> i.e. to res, coveralls will be placed in a 5-gallon <br /> bucket <br /> Location of Wash Water. Restroom on-site <br /> Location of Toilet. Restroom on-site <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored <br /> on-site until appropriate disposal methods <br /> are determined. <br /> PAGE 11 <br />