Laserfiche WebLink
ATC SITE SAFETY PLAN <br /> Job Name: Edison High School <br /> Job Location: 1425 South Center Street, Stockton, California <br /> Client Name: Mr.Butch Schmidt, Sto kton Unified School District <br /> Project Number: 17292.0003 <br /> General Work Description: Installation of So it Barings <br /> SSP Prepared by: Drew Van Allen <br /> On-site Safety Officer: Tom Lutterman <br /> Project Safety Officer: Jeanne Homsey <br /> This site health and safety plan (SSP) must be lept on-site and accessible to all on-site <br /> employees during all phases of site operations. The S 3P must be reviewed and signed by all on- <br /> site employees, subcontractors, and. visitors prior I o entering the site. General safe work <br /> practices are identified in the ATC Associates Inc.'s Injury and Illness Prevention Manual and i <br /> apply to all ATC work sites. <br /> The provisions set-forth in this SSP shall apply to ATC employees and any subcontractors <br /> working for ATC at the job site. All personnel work ng for ATC at the job site must read this <br /> SSP, and sign the attached Compliance Agreemer t before entering the work area. Field <br /> personnel may deviate from the safety provisions set forth in this SSP, but only to upgrade or <br /> increase the safety requirements. ;ATC personae may suspend work if unsafe working <br /> conditions are identified or observed,or unautho ' modifications to the safety provisions set- <br /> forth <br /> etforth in this SSP are made. If changes in site or wo king conditions require changes in safety <br /> procedures,appropriate amendments to this SSP will be provided by the ATC project manager <br /> or supervisor,with the written approval of a ATC pr jest safety officer or the ATC Health and <br /> Safety Director. <br /> PAGE <br />