My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 2:19:24 PM
Creation date
2/27/2019 10:47:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�t t 16 June 2008 <br /> t Messrs Trommer and L' n page 7 of 7 <br /> Preliminary Five-Year Review Letters <br /> Various Sites <br /> 11530 Eight Mile Road, W. <br /> • The CUF recommended directing assessment and implementation of active <br /> remediation; the EHD agrees with the intent of the recommendation, but believes <br /> that that directive should be withheld until a pending report of findings from a <br /> recently complete deep delirieation investigation and a pending SCM has been <br /> received and reviewed'by the EHD. <br /> 14749 Thornton Road, N. <br /> The CUF recommended evaluation of the sampling frequency and <br /> implementation of SV;EIIAS. The EHD agrees with the recommendations; a RAP <br /> has been approved, the needed wells have been installed and the remediation <br /> system is under construction. <br /> 156157 Ih Street, S. <br /> • The CUF recommended implementation of active remediation without delay; the <br /> EHD agrees with this recommendation. A favorable pumping test has been <br /> completed and. reported, DPE has been approvedfor the site, the system has <br /> been installed.and permits to operate are pending from the City and SJVUAPCD. <br /> 23569 Santa Fe Road, S.. <br /> The CUF recommended termination of SVE and, monitoring groundwater for one. <br /> hydrological cycle.. The EHD agrees with the recommendation; a work plan to <br /> install fourteen MIP borings on and off site has been approved. <br /> 800 Main Street, E. <br /> + The CUF agreed with the EHD on the approved remedial work plan. <br /> Questions.or comments should be directed to the appropriate caseworker. <br /> a <br /> Sincerely, <br /> J + I <br /> Harlin Knoll, RENS. Michael In rna, RENS IJ <br /> l Senior Registered Environmental Senior Registered Environmental <br /> Health Specialist Health Specialist <br /> Nuel Henderson, PG. Margaret LaWbrio, RENS. <br /> Engineering Geologist Program Coordinator <br /> I <br /> i <br /> i <br /> 5-Year Review Comment Letter 061608.doe <br /> i �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.