My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 2:19:24 PM
Creation date
2/27/2019 10:47:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ Page 1 of 1 <br /> Mike Infurna [EH] F <br /> From: Anderson, Paul [PAnderson@pscnow_com] <br /> Sent: Friday, February 08, 2008 4:27 PM <br /> To: Mike Infurna [EH] <br /> Cc: Jander, Scott <br /> Subject: GeoTracker Upload Notification (RI WP Addendum)- Case# 2371, Sara Lee 1717 S. Center St., <br /> Stockton <br /> Mike, <br /> This email serves as notification that the Remedial Investigation Work Plan -Addendum <br /> (February 8, 2008) for the Sara Lee-Center Street site (Case # 2371) has been uploaded into <br /> GeoTracker. .This Addendum addresses the second phase of the investigation, which pertains <br /> to the installation of three monitoring wells based on the soil and groundwater investigation <br /> performed in November 2007. <br /> Per your previous request, a hard copy of the document will not follow. ` <br /> As a side note, you will notice that John Carrow has signed/stamped the work plan Addendum <br /> as the CAPG, instead of Tom Neely of ETIC. John Carrow (former PSC employee) has <br /> returned to PSC and since John is a registered geologist with the state of California, PSC <br /> corporate management has decided to utilize John in this capacity. .Therefore, ETIC will be _ <br /> transitioning their role as CAPG to. PSC. ETIC will still be supporting PSC with regard to field <br /> support and other minor roles. . <br /> Please feel free to call with any questions. - <br /> Thank you. <br /> Paul Anderson <br /> PSC-QA.Director <br /> 210 West Sand Baa,.Road !I <br /> Coluinibia,If_62236 <br /> Office: (61S)281-1 43 <br /> Cell: (618)406-082.; <br /> Fax: (618)281-7420 <br /> �a€derso€1(r��scNolv.ec�m :1 <br /> f <br /> 2/11/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.