My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 2:19:24 PM
Creation date
2/27/2019 10:47:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S t <br /> + s <br /> September 13, 2007 <br /> Project;.62401510 <br /> Mt.Michael Infurna Jr. $$ . <br /> Senior REHS <br /> San Joaquin County Divironmental.-Health Department / In <br /> 600 East Main Street. /,t <br /> Stockton, California 95202-3029 U <br /> (209) 468-3454 <br /> Dear Mr. Infurna: <br /> Subject; Site Conceptual Model sind Revised Remedial Investigation Work Pian <br /> (Sep I3,200'7) ; <br /> . j <br /> Tormer Kilpatrick'.s Bakeries,.Inc. <br /> 1717 South Center Street <br /> Stockton, California 95206 <br /> Reference: ,Facility Site Code: 237.1 <br /> t <br /> t On behalf of Sara L•ee Bakery Group, Inc. (Sara .Lee), .Philip Environmental Services <br />` Corporation (PSC) is submitting the enclosed work plan. This enclosure contains the Site <br /> Conceptual Model .and Revised R_ enzedial Investigation Work Plan, for `the above <br /> referenced facility. The work plan addresses data gaps identified in the Site Conceptual <br /> Model, which will further assess the extent of residual petroleum-hydrocarbon impacts; <br /> k north and northwest of the former underground storage tank excavation.. ' The work.plan <br /> has been prepared in. response to the San joaqui' County Environmental Health <br /> Department letter dated August 1,2007. <br /> The work plan was prepared by ETIC Engineering;.Inc. on behalf of PSG. Please call <br /> with any questions concerning the work plan. <br /> II� Respectfully, <br /> PSC Environmental Services <br /> Paul'Anderson ` <br /> QA Director/Project Manager-,. <br /> S:SlmufYJSitSan LeelAojeetS�l�ICaperrkw7 w1 sckl &—A lRen�51l iA_zigmoaLLOT&''ra7_99J1.3CM A Kevri,3nsedul la—ftbiftW�d Am•Ca -WT-SICEEIU.W - <br /> c.c_ Matt Gabris 5a n Lee Bakery Group,Inc. <br /> James Barton—Central Valley Rcgion,Water Quality Control Board <br /> Mark Owens-State water Resources Control Board,UST Clean Up,Fuhd <br /> PSC tNJ RONMENTACSERV.ICES <br /> 210 West Sand Bank Road,-Columbia,IL62236. <br /> (6t&)281'-1543.;"Fax(61 8)281.4020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.