My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 2:19:24 PM
Creation date
2/27/2019 10:47:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I s <br /> Ms. Lanctot -2- September 30, 2002 <br /> i <br /> f <br /> AU costs for corrective action must meet the requirements of Article 11, Chapter 16, <br /> Underground Storage Tank Regulations in order to be eligible for reimbursement <br /> • The Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. However, if costs <br /> { exceed the above pre-approved amounts, the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> i • The work products must be acceptable to the County. <br /> r ! <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs <br /> . - - <br /> = on the"new scope of work. <br /> • Although I have referred to the PSC proposal in my pre-approval above,please be aware that <br /> you will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services,don't hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> j invoices to include the required breakdown of costs on a time and materials basic, that. <br /> f invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> `E provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor,invoices,,_, -- <br /> a - <br /> • technical reports, when available, and <br /> • applicable correspondence from the regulatory agency. <br /> i <br /> Please call if you have any questions; I can be reached at (916) 341-5796. <br /> Sincerely, <br /> li <br /> Mark Owens, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> California Environmental Protection Agency <br />
The URL can be used to link to this page
Your browser does not support the video tag.