My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 12:29:07 PM
Creation date
2/27/2019 11:03:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subject:Remedial Investigatidn Wank Plan-Addendum <br /> Reference:Facility Site Code:2371 <br /> February 8,2008 <br /> Page 4 of 7¢ <br /> PSC will implement the work addressed in the Addendum and the Work_Plat! upon <br /> receiving SJCEHD approval, corresponding permits, and scheduling s6contractots. The <br /> written report summarizing the results of both tha soil'.and groundwater investigation and <br /> the well' installations will:be completed within eights weeks'following receipt of <br /> analytical data for soil and groundwater samples collected during the well installation: <br /> Please call with any questions concerning the Addendum or the Work Plan <br /> Respectfully, <br /> Philip Environmental Services Corporation . JOHN R. � <br /> * CARROW <br /> Na 55Z5 =� t <br /> Paul Anderson John Carro <br /> QA Director/Project Manager° ,Senior Projec er € <br /> S15hrv{y15R5aa LtcVlajoalSla[ktw(Cma S-10MR I I-SM k t4�isalMcwtirl WaLkjsimlWvl rts`Mdm AWPA IDTa'4�Ttu:_cs- e,�M�[m wmc ire Mdmdm_C_ ' <br /> L0T8 Tca-5f[Elm.dx - . <br /> C.C. Mate Gabris —Sara Lee Bakery Group,Inc: <br /> James Barton —Central Valley.Region,Water Quality Control Board <br /> Mark Owens State ater Resources Control`Board;UST Clean Up Fund <br /> ATTACHMENTS: <br /> APPENDIX A REGULATORY CORRESPONDENCE <br /> OCTOBER 4,2007 S.ICEHD LETTER. <br /> DECEMBER 11,2007 ETICEXTENSION L'I-I' WITH SJCEHD.APPROVAL <br /> APPENDIX.B - 'TABLE 1--ANALYTICAL DATA.FOR SOILSAMPLES <br /> TABLE 2-ANALYTICAL GROUNDWATER SAMPLES <br /> APPENDLX C FIGURE.1—SITE LoCATioN ANDTOPOGRAPIUC MAP <br /> FIGURE 2—SITE VICnvrrY MAP . <br /> FIGURE 3=SAMPLING AND PROPOSED WELL INSTALLATION LOCATIONS <br /> - <br /> PHILIP.,ENVIRONMENTAL sERyiCES CORPORA'T'ION° <br /> 210 West Sand Bank Road.Columbia,IL 62236,- <br /> {618}261-1543 Faz(61ij281-7020 <br /> i <br /> F _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.