My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 12:29:07 PM
Creation date
2/27/2019 11:03:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Desuuclion Work Plan <br /> SJCEMD Case Number.2371 <br /> April 19,2012 <br /> Page 4 of 5 <br /> out of the cut casing and fills in the excavated 6-inch void beneath the top of cut casing and up to <br /> a minimum of 6-inches above the cut casing. <br /> The soil, water, and well debris investigative derived-waste generated during the well destruction <br /> activities will be stored in DOT approved 55-gallon drums. The drums will be transported to a <br /> licensed waste disposal facility for proper disposal. <br /> POST-FIELD ACTIVITIES <br /> The post-field activities include completion of the California DWR Well Destruction Reports <br /> and the SJCEHD Well Destruction Completion Report. PSC will notify the property owner that <br /> the field activities have been completed. PSC will prepare the required DWR reports with the <br /> specific essential information regarding well destruction. PSC will forward the DWR reports to <br /> Gregg Drilling for their review and approval. Upon receipt of the signed reports from Gregg <br /> Drilling, PSC will submit the completed reports to the California DWR. Then, PSC will prepare <br /> a Well Destruction Completion Report and submit the report to the SJCEHD. <br /> SCHEDULE OF PLANNED SITE ACTIVITIES <br /> Upon receipt of approval of this Work Plan from SJCEHD, PSC will begin preparing the permits <br /> required to perform the field activities and schedule subcontractors. Once the permits have been <br /> approved, PSC will begin coordinating with the property owner and the various subcontractors to <br /> finalize the schedule the field activities. Field activities are anticipated to occur sometime in <br /> May or June 2012. <br /> Subsequent to the field activities, PSC will submit the necessary DWR Reports and will then <br /> submit a Well Destruction Completion Report to the SJCEHD. PSC anticipates that the Well <br /> Destruction Completion Report will be prepared and submitted in June or July 2012. <br /> Please call with any questions concerning this Work Plan. <br /> Respectfully, <br /> PSC Industrial Outsourcing, LP <br /> y�U ,2•a� e.-. <br /> Paul Anderson Date C� G ��OG, <br /> Project Manager <br /> JOHN R. -� <br /> CARROW <br /> John rrow, PG#5525 Date (Sta OFC <br /> Senio eologist <br /> S.1shveNVStt Lx iPnNaMCWA f:AS.,kin.M 11717 S.+mhC.rna51rR711d1�1 I.Wdlahael—t14%Wi,A PIu,t2012104 %Vd1 p1.,00ri,un lVnh rim.SJCEHD IC.ixraP&d.w <br /> [IS( INi)l S1RIA1 4)t ISO1I;RCWG.I P <br /> 210 West Sand 11ank gold.Cillumbla,11 11:236 <br /> ((A8)28I-I5}3 I`ax(619)281.7024) <br />
The URL can be used to link to this page
Your browser does not support the video tag.