Laserfiche WebLink
4 ESTIMATED SCHEDULE <br /> Should EHD direct that pilot testing of an airs ar in soil venting pilot test be <br /> P g P g � g <br /> performed, Philip has outlined a proposed schedule as shown below The starting <br /> point of the schedule is concurrent with the submittal of this Work Plan, direction <br /> from the EHD to perform a pilot test, cost pre-approval from the California UST <br /> Fund to perforin the directed work, and obtaining a permit exemption from the local <br /> air quality management district Equipment delivery schedules may vary at the time <br /> of order No time has been allocated for preparation of bid documents, if necessary <br /> Construction schedules may vary depending on seasonal conditions Utility service <br /> connections may also affect construction schedules <br /> ESTIMATED SCHEDULE <br /> rrEM WEEK <br /> NUMBER PROJECT TASKS 1 2 3 4 5 6 7 8 9 10 11 12 <br /> 1 Equipment Procurement <br /> 2 Equipment Assembly <br /> 3 Equipment Installation <br /> 4 System Startup& Pilot Testing <br /> 5 Laboratory Analysis <br /> 6 Data Review <br /> . 7 CAP <br /> 13 <br /> Pilot Testing Work Plan <br /> 1717 South Center Street-Stockton,California <br /> Prepared by Philcp Services Corp <br />' H lENV162400[325121382EGUNDje tslS=kCrnt\pJonatpJan doc July 23,2002 <br />