STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> INDOOR LIGHTING LIGHTING CONTROLS .0 INDOOR LIGHTING LIGHTING CONTROLS .0 INDOOR LIGHTING LIGHTING CONTROLS is
<br /> CEC-NRCC-LTI-02-E Revised 01/16 CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-02-E Revised 01/16 CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-02-E Revised 01/16 CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E
<br /> Indoor Lighting-Lighting Controls (Page 2 of 3) Indoor Lighting-Lighting Controls (Page 2 of 3) Indoor Lighting-Lighting Controls (Page 2 of 3)
<br /> Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name: Target Remodel - T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019
<br /> A separate document must be filled out for Conditioned and Unconditioned Spaces.This page is used only for the following: A separate document must be filled out for Conditioned and Unconditioned Spaces.This page is used only for the following: A separate document must be filled out for Conditioned and Unconditioned Spaces.This page is used only for the following:
<br /> Q CONDITIONED SPACES ❑ UNCONDITIONED SPACES Q CONDITIONED SPACES ❑ UNCONDITIONED SPACES Q CONDITIONED SPACES ❑ UNCONDITIONED SPACES
<br /> B.Mandatory and Prescriptive Indoor Lighting Control Schedule,PAF Calculation,and Field Inspection Checklist B. Mandatory and Prescriptive Indoor Lighting Control Schedule,PAF Calculation,and Field Inspection Checklist B.Mandatory and Prescriptive Indoor Lighting Control Schedule,PAF Calculation,and Field Inspection Checklist
<br /> PAF Credit Calculation Z L
<br /> PAF Credit Calculation Z U _0 PAF Credit Calculation Z U -a o TARGET®
<br /> ° v o ° o
<br /> rp L U MA= U r6 L U
<br /> O 41 t�U Q a Q O T W }, _ Q S Q ° 2 W Q a Q
<br /> C O ++ J 41 n
<br /> y O LL +`-+ "O U C O O J U ai C
<br /> i t a ° v x u a) ° +' Q x U y o ,� v v
<br /> Standards Complying With o f u v v p y g Q ° v x 1000 NICOLLET MALL
<br /> O °p ° '� Q N -O 1 j O J a U ` Y Q W a) 1 j ° J a U ` Y Q MINNEAPOLIS, MN 55403
<br /> Standards Complying in With > ° °A ° v -- N Standards ComplyingWith > ° n ° v -- a)
<br /> Lighting Control Schedule (✓all that apply,or enter`E' if Exempted) U ~ M Lighting Control Schedule (✓all that apply,or enter'E' if Exempted) " ~ " Lighting Control Schedule (✓all that apply,or enter'E' if Exempted) U ~
<br /> 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
<br /> Type/Description of Lighting
<br /> Type Description of Lighting Type Description of Lighting
<br /> _ _ _ _ # v a 0 a Control (i.e.: occupancy sensor,
<br /> Control (i.e.: occupancy sensor, # `o � � � a, � -a Control (i.e.:occupancy sensor, _ _ _ M
<br /> Location in Building automatic time switch, of o 0 0 0 0 0 o to Location in Building automatic time switch, of o 0 0 0 0 0 0 i Location in Building automatic time switch, of o 0 0 0 0 0 0
<br /> M M M M M a- M M M M M d M M M M M a
<br /> dimmer, automatic daylight, Units 0, a, p dimmer,automatic daylight, Units �, q 4i p 4, dimmer, automatic daylight, Units 4 10, �, � q
<br /> etc...) etc...) etc...)
<br /> Storage 164 1 1� ❑ © ❑ ❑ ❑ ❑ V ❑ ❑ Lounge 157 1 1� ❑ © ❑ ❑ ❑ ❑ ❑ ❑ Circulation 118 1 1� ❑ D ❑ ❑ ❑ ❑ ❑ ❑
<br /> Conference 163 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ r ❑ ❑ Circulation/Lockers 151 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ r ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ DC ENGINEERING
<br /> STL Office 161 1 2 2 0 ❑ ❑ ❑ ❑ V ❑ ❑ TSC Storage/Equipment 11 1 0 ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ 1 Careful listening. Dynamic solutions.
<br /> ETL-HR Office 156 1 13 3 0 ❑ ❑ ❑ ❑ V 1 ❑ ❑ Tmsc 109 1 0 0 El ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ www.dcengineering.net
<br /> Circulation 108 1 ❑ d 1:1 ❑ ❑ ❑ ❑ V ❑ ❑ Circulation 117 1 0 In ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑
<br /> Training 158 ❑ ❑ ❑ ❑ V ❑ ❑ Storage 160 1 ❑ ❑ ❑ Elr ❑ ❑ El ❑ ❑ El El El El ❑ ❑ Phone:208.288.2181 Project:18TAR17
<br /> Control Credit PAGE TOTAL(Sum of Column 13): 0 Control Credit PAGE TOTAL(Sum of Column 13): 0 Control Credit PAGE TOTAL(Sum of Column 13): 0
<br /> IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13): 0 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13): 0 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13): 0
<br /> Enter Control Credit total Enter Control Credit total Enter Control Credit total
<br /> into NRCC-LTI-01-E; Page into NRCC-LTI-01-E; Page into NRCC-LTI-01-E; Page
<br /> 1. 1. 1.
<br /> 1. §130.1(a)=Manual area controls;§130.0(b)=Multi Level;§130.1(c)=Auto Shut-Off; §130.1(d)=Mandatory Daylight;§130.1(e)=Demand Responsive; §140.6(d)= 1. §130.1(a)=Manual area controls;§130.0(b)=Multi Level;§130.1(c)=Auto Shut-Off; §130.1(d)=Mandatory Daylight;§130.1(e)=Demand Responsive; §140.6(d)= 1. §130.1(a)=Manual area controls;§130.0(b)=Multi Level;§130.1(c)=Auto Shut-Off; §130.1(d)=Mandatory Daylight;§130.1(e)=Demand Responsive; §140.6(d)_
<br /> Additional lighting controls installed to earn a PAF;§140.6(d)=Prescriptive Secondary Sidelit Daylight Controls. Additional lighting controls installed to earn a PAF;§140.6(d)=Prescriptive Secondary Sidelit Daylight Controls. Additional lighting controls installed to earn a PAF;§140.6(d)=Prescriptive Secondary Sidelit Daylight Controls.
<br /> 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces.As a condition to earn a PAF, an Installation Certificate is 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces.As a condition to earn a PAF, an Installation Certificate is 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces.As a condition to earn a PAF, an Installation Certificate is
<br /> also required to be filled out,signed, and submitted. also required to be filled out,signed, and submitted. also required to be filled out,signed, and submitted.
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> INDOOR LIGHTING LIGHTING CONTROLS 0 INDOOR LIGHTING LIGHTING CONTROLS .0 INDOOR LIGHTING LIGHTING CONTROLS
<br /> CEC-NRCC-LTI-02-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-02-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-02-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E
<br /> Indoor Lighting-Lighting Controls (Page 2 of 3) Indoor Lighting-Lighting Controls (Page 2 of 3) Indoor Lighting-Lighting Controls (Page 2 of 3)
<br /> Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name: Target Remodel - T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019
<br /> Date No. Description
<br /> A separate document must be filled out for Conditioned and Unconditioned Spaces.This page is used only for the following: A separate document must be filled out for Conditioned and Unconditioned Spaces.This page is used only for the following: A separate document must be filled out for Conditioned and Unconditioned Spaces.This page is used only for the following: 01/17/2019 PERMIT SET
<br /> ❑ CONDITIONED SPACES 13 UNCONDITIONED SPACES ❑ CONDITIONED SPACES 13 UNCONDITIONED SPACES ❑ CONDITIONED SPACES 2 UNCONDITIONED SPACES
<br /> B.Mandatory and Prescriptive Indoor Lighting Control Schedule,PAF Calculation,and Field Inspection Checklist B.Mandatory and Prescriptive Indoor Lighting Control Schedule,PAF Calculation,and Field Inspection Checklist B.Mandatory and Prescriptive Indoor Lighting Control Schedule,PAF Calculation,and Field Inspection Checklist
<br /> PAF Credit Calculation Z v PAF Credit Calculation Z PAF Credit Calculation z v
<br /> U -O 0 U _0 0 U -°
<br /> C U ++ C N a�
<br /> N w -O i.+ O N +� O U1
<br /> Q cl Q
<br /> 0 p a N O T = Q 0 p a N CL
<br /> C
<br /> O LL O J N C vt O Li -° J U c 0 '+, LL +� -O J u N c
<br /> 1 r}0 � �4q a- 0 `) Y Q -O 1 4t; W d 0 `, Y Q om„ 1 c}p bD d 0 N Y Q -O
<br /> Standards Complying With ° J v -- w ° a, Standards Complying With ° J v - w ° Standards Complying With ° J v -- w ° a,
<br /> Lighting Control Schedule (✓all that apply,or enter'E' if Exempted) u ~ Lighting Control Schedule (✓all that apply,or enter'E' if Exempted) u ~ Lighting Control Schedule (✓all that apply,or enter'E' if Exempted) u ~
<br /> 01 02 03 04 05 06 07 08 09 10 1 11 12 13 14 15 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
<br /> Type/Description of Lighting Type/Description of Lighting Type/Description of Lighting
<br /> Control (i.e.: occupancy sensor, # o a -(31 :aa, a Control (i.e.:occupancy sensor, # ;o a _31 :a a -(;, a Control (i.e.: occupancy sensor, # ° a -(31 a a
<br /> Location in Building automatic time switch, of 0 0 0 0 0 0 ru _ Location in Building automatic time switch, of 0 0 0 0 0 0 0 ro ,i Location in Building automatic time switch, of 0 0 0 0 0 0 0
<br /> m m m m m v a LL m m m m m v a m m m m m v
<br /> dimmer, automatic daylight, Units �, 10 �, �, �, IAOn 4 dimmer,automatic daylight, Units o w, o 0 4, LO w, dimmer,automatic daylight, Units �, �, �, �, �, �1 4
<br /> etc...) etc...) etc...)
<br /> Fittina Room 1 Izi 1;3 © 1 ❑ ❑ 1 ❑ ❑ ❑ ❑ Storacle 164 1 IZI ❑ © ❑ ❑ ❑ ❑ ❑ ❑ Loun e 157 1 1� ❑ © ❑ ❑ ❑ ❑ ❑ ❑
<br /> Main Sales Track 1 ❑ ❑ 12 ❑ ❑ ❑ ❑ v ❑ ❑ Conference 163 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Circulation/Lockers 151 1 ❑ 12 12 ❑ ❑ ❑ ❑ v ❑ ❑
<br /> Flexible Fulfillment 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ STL Office 161 1 ❑ 0 13 ❑ ❑ ❑ ❑ ❑ ❑ TSC Storage/Equipment 11 1 ❑ ❑ 2 ❑ ❑ ❑ ❑ ❑ ❑
<br /> Men's Restroom 1 D D ❑ ❑ ❑ ❑ ❑ ❑ ETL-HR Office 156 1 3 0 3 ❑ ❑ ❑ ❑ ❑ ❑ Tmsc 109 1 0 0 3 ❑ ❑ ❑ ❑ ❑ ❑
<br /> Women's Restroom 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ Circulation 108 1 ❑ 1:1 Circulation 117 1 ❑ [°� ❑ ❑ ❑ ❑ ❑ ❑
<br /> Open Office 162 ❑ ❑ ❑ ❑ ❑ ❑ Training 158 ❑ ❑ ❑ ❑ ❑ ❑ Storage 160 ❑ ❑ ❑ ❑ ❑ ❑
<br /> Control Credit PAGE TOTAL(Sum of Column 13): 0 Control Credit PAGE TOTAL(Sum of Column 13): 0 Control Credit PAGE TOTAL(Sum of Column 13): 0
<br /> IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13): 0 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13): 0 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13): 0
<br /> Enter Control Credit total Enter Control Credit total Enter Control Credit total
<br /> into NRCC-LTI-01-E; Page into NRCC-LTI-01-E; Page into NRCC-LTI-01-E; Page
<br /> 1. 1. 1.
<br /> 1. §130.1(a)=Manual area controls;§130.0(b)=Multi Level;§130.1(c)=Auto Shut-Off; §130.1(d)=Mandatory Daylight;§130.1(e)=Demand Responsive; §140.6(d)= 1. §130.1(a)=Manual area controls;§130.0(b)=Multi Level;§130.1(c)=Auto Shut-Off; §130.1(d)=Mandatory Daylight;§130.1(e)=Demand Responsive; §140.6(d)= 1. §130.1(a)=Manual area controls;§130.0(b)=Multi Level;§130.1(c)=Auto Shut-Off; §130.1(d)=Mandatory Daylight;§130.1(e)=Demand Responsive; §140.6(d)_
<br /> Additional lighting controls installed to earn a PAF;§140.6(d)=Prescriptive Secondary Sidelit Daylight Controls. Additional lighting controls installed to earn a PAF;§140.6(d)=Prescriptive Secondary Sidelit Daylight Controls. Additional lighting controls installed to earn a PAF;§140.6(d)=Prescriptive Secondary Sidelit Daylight Controls.
<br /> 2. Check Table 140.6-A for correct Factor. PRFs shall not be traded between conditioned and unconditioned spaces.As a condition to earn a PAF, an Installation Certificate is 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces.As a condition to earn a PAF, an Installation Certificate is 2. Check Table 140.6-A for correct Factor. PRFs shall not be traded between conditioned and unconditioned spaces.As a condition to earn a PAF, an Installation Certificate is
<br /> also required to be filled out,signed, and submitted also required to be filled out,signed, and submitted. also required to be filled out,signed, and submitted.
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> INDOOR LIGHTING LIGHTING CONTROLS INDOOR LIGHTING LIGHTING CONTROLS INDOOR LIGHTING POWER ALLOWANCE is
<br /> CEC-NRCC-LTI-02-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-02-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-03-E(Revised 04/16) CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E
<br /> Indoor Lighting-Lighting Controls (Page 2 of 3) Indoor Lighting-Lighting Controls (Page 3 of 3) Certificate of Compliance-Indoor Lighting Power Allowance (Page 1 of 4)
<br /> Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name:Target Remodel- T0738 Tracy, CA Date Prepared: 1/10/2019
<br /> A separate document must be filled out for Conditioned and Unconditioned Spaces.This page is used only for the following: DOCUMENTATION AUTHOR'S DECLARATION STATEMENT A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: QROF SIOVq
<br /> 11 CONDITIONED SPACES 2 UNCONDITIONED SPACES 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. ® CONDITIONED spaces 1:1 UNCONDITIONED spaces GO'4
<br /> Documentation Author Name: Edgar Valle Documentation Author Signature: =Q 2
<br /> g � zrn
<br /> m
<br /> B.Mandatory and Prescriptive Indoor Lighting Control Schedule,PAF Calculation,and Field Inspection Checklist Company: Signature Date: A.SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES 181
<br /> p DC Engineering 1/10/2019
<br /> PAF Credit Calculation z vAddress: CEA Certification Identification(if applicable): ElIf using Complete Building Method for compliance, use only the total in column (a)as total allowed building watts. * 3
<br /> ` 440 East Corporate Drive, Suit 103
<br /> v 0 ❑ If using Area Category Method,Tailored Method,or a combination of Area Category and Tailored Method for compliance, use only the total in column(b)as the total CTR�cP���P
<br /> a ° a city/state/zip: Meridian, ID 83642 Phone:
<br /> 0 _ ° LL o J v v N 208-288-2181 allowed building watts 9TFOF CA�\F�Q�
<br /> t Qc v x U RESPONSIBLE PERSON'S DECLARATION STATEMENT (a) (b)
<br /> Standards Complying With i f0 ° °� a ° u w
<br /> U J u L' I certify the following under penalty of perjury,under the laws of the State of California: 01 Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI-03-E(below on this page) 142,772
<br /> Lighting Control Schedule (✓all that apply,or enter'E' if Exempted) 1. The information provided on this Certificate of Compliance is true and correct. 02 Area Category Method Allowed Watts. Documented in section C-1 of NRCC-LTI-03-E(below on this page)
<br /> 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
<br /> (responsible designer). 03 Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E
<br /> Type/Description of Lighting 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or stem design identified on this Certificate of TOTAL ALLOWED BUILDING WATTS. Enter number into correct cell on NRCC-LTI-01 Page 2, Row 1 1/17/2019
<br /> ^ gY p p p g g Y g g 142,772
<br /> Control (i.e.: occupancy sensor, # o : a :° Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
<br /> © Check here if building contains both conditioned and unconditioned areas.
<br /> Location in Building automatic time switch, of o 0 0 0 0 6 0 0 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
<br /> vZT documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this buildin permit pplication.
<br /> dimmer, automatic daylight, Units ,q, LO) ,4, IAOn IAOn .� ,A,
<br /> IAOn 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permits)i ed fo t building,and made available to the B.COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE qlzt
<br /> etc...) enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Complian i equ' e o be included with the documentation the
<br /> 1 [� © ❑ ❑ ❑ ❑ ❑ ❑ builder provides to the building owner at occupancy. 01 02 03 04 MO
<br /> Circulation 118 Responsible Designer Name: JON GORANSON Responsible Designer Signature: WATTS X COMPLETE _ ALLOWED ` J
<br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ - '
<br /> TYPE OF BUILDING (From§140.6 Table 140.6-B) PER ft BLDG.AREA WATTS ^
<br /> u
<br /> 11 1:1 13 1:1 13 13 13 11 DC 2 DC Engineering Date signed. 1/15/2019 Grocery Store Building 1.50 95,181 142,772
<br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Address: License: Total Area:
<br /> 440 E. Corporate Dr. 18189
<br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ city/state/zip: Meridian, ID 83642 208-288-2181 Phone: Total Watts. Enter Total Watts into section A, row 1 (Above on this page)
<br /> 11 El El El El El 1:1 ❑ ❑
<br /> LU z
<br /> Control Credit PAGE TOTAL(Sum of Column 13): 0
<br /> C-1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES Watts
<br /> IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column 13): 0 Total from section C-2.
<br /> Enter Control Credit total Total from section C-3. O
<br /> into NRCC-LTI-01-E; Page Total Watts. Enter Total Watts into section A, row 2 (Above on this page). LL
<br /> 1. For Alterations Only-Reduced lighting power option (Total Allowed Watts x 0.85). Enter this value into section A, row 2 if using this option. J
<br /> 1. §130.1(a)=Manual area controls;§130.0(b)=Multi Level;§130.1(c)=Auto Shut-Off; §130.1(d)=Mandatory Daylight;§130.1(e)=Demand Responsive; §140.6(d)_
<br /> Additional lighting controls installed to earn a PAF;§140.6(d)=Prescriptive Secondary Sidelit Daylight Controls.
<br /> 2. Check Table 140.6-A for correct Factor. PRFs shall not be traded between conditioned and unconditioned spaces.As a condition to earn a PAF, an Installation Certificate is U
<br /> also required to be filled out,signed, and submitted.
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance April 2016 f
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> INDOOR LIGHTING POWER ALLOWANCE INDOOR LIGHTING POWER ALLOWANCE INDOOR LIGHTING POWER ALLOWANCE Q
<br /> CEC-NRCC-LTI-03-E(Revised 04/16 CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-03-E(Revised 04/16 CALIFORNIA ENERGY COMMISSION CEC-NRCC-LTI-03-E(Revised 04/16 CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E
<br /> Certificate of Compliance-Indoor Lighting Power Allowance (Page 1 of 4) Certificate of Compliance-Indoor Lighting Power Allowance (Page 2 of 4) Certificate of Compliance-Indoor Lighting Power Allowance (Page 2 of 4)
<br /> Project Name:Target Remodel- T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019 Project Name: Target Remodel -T0738 Tracy, CA Date Prepared: 1/10/2019 W
<br /> W
<br /> A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: J
<br /> ❑ CONDITIONED spaces ❑ UNCONDITIONED spaces 10 CONDITIONED spaces ❑ UNCONDITIONED spaces ❑ CONDITIONED spaces 12 UNCONDITIONED spaces (D
<br /> A.SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES C-2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE C-2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE
<br /> ❑ If using Complete Building Method for compliance, use only the total in column (a)as total allowed building watts. ❑ Do not include portable lighting for offices. Portable lighting for offices shall be documented only in Section G of NRCC-LTI-01-E. ❑ Do not include portable lighting for offices. Portable lighting for offices shall be documented only in Section G of NRCC-LTI-01-E.
<br /> ❑ If using Area Category Method,Tailored Method,or a combination of Area Category and Tailored Method for compliance, use only the total in column(b)as the total ❑ Separately list lighting for each primary function area as defined in §100.1 of the Standards. ❑ Separately list lighting for each primary function area as defined in §100.1 of the Standards. Q
<br /> allowed building watts 01 02 03 04 01 02 03 04 co
<br /> (a) (b) AREA CATEGORY From §140.6 Table 140.6-C AREA CATEGORY From §140.6 Table 140.6-C W
<br /> 01 Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI-03-E(below on this page) 1,373 ( ) WATTS ALLOWED ( ) WATTS ALLOWED
<br /> 02 Area Category Method Allowed Watts. Documented in section C-1 of NRCC-LTI-03-E(below on this page) ^'
<br /> Location in Building Primary Function Area per Table 140.6-C PER ft X AREA(ft) = WATTS Location in Building Primary Function Area per Table 140.6-C PER ft X AREA(ft) = WATTS ` V
<br /> 03 Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E
<br /> TOTAL ALLOWED BUILDING WATTS. Enter number into correct cell on NRCC-LTI-01,Page 2, Row 1 1,373
<br /> © Check here if building contains both conditioned and unconditioned areas. Project Number T-0738
<br /> B.COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE
<br /> 01 02 03 04 Config: LL
<br /> WATTS X COMPLETE = ALLOWED Drawn By E.VALLE
<br /> TYPE OF BUILDING (From§140.6 Table 140.6-B) PER ftZ BLDG.AREA WATTS
<br /> Grocery Store Building 1.50 915 1,373
<br /> Total Area:
<br /> Checked By B.H U NT
<br /> Total Watts. Enter Total Watts into section A, row 1 (Above on this page)
<br /> C-1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES Watts
<br /> Total fromsection C-2.
<br /> Total from section C-3. LIGHTING ENERGY
<br /> Total Watts. Enter Total Watts into section A, row 2 (Above on this page).
<br /> For Alterations Only-Reduced lighting power option (Total Allowed Watts x 0.85). Enter this value into section A, row 2 if using this option. COMPLIANCE
<br /> TOTALS 0 TOTALS 0
<br /> Enter sum total Area Category allowed watts into section C-1 of NRCC-LTI-03-E (this compliance document) 0 Enter sum total Area Category allowed watts into section C-1 of NRCC-LTI-03-E (this compliance document) 0
<br /> WATTS WATTS
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance April 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance April 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance April 2016 E003
<br /> 1/17/2019 11:40:45 AM
<br />
|