Laserfiche WebLink
k <br /> II <br /> 23 December 2005 <br /> AGE-NC Project No 00-0769 <br /> Page 8 of 8 <br /> • After lateral definition,preparation of a Site Conceptual Model Identifying source/s,fate and <br />' transport mechanisms and potential sensitive receptors <br /> I <br /> • Preparation of an Interim.Remedial Action Plan detailing procedures to mitigate the core <br />' mass of contamination at the former UST locations , <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> I points(I e ground water samples)and subsurface conditions may vary away from these data points <br /> No other warranty,expressed or Implied,is made as to the professional interpretations,opinions,and <br /> recommendations contained in this report <br /> 1 I <br /> 4 <br /> l <br /> c r I S <br /> s r <br /> s <br /> r I 4 I <br /> r } <br /> I <br /> � I s <br />' Advanced GeoEnvironmentai,Inc <br /> � k <br />