Laserfiche WebLink
SITE HEALTH AND SAFETY PLAN <br /> I. PROJECT INFORMATION <br /> Project Number: 12066.000..000 Date: May 6,2015 <br /> Project Name: PCCP Mountain House Property Client: Solar Finance Inc <br /> Contact: Divya Bhargava Phone: (925)866-9000 <br /> Site Location: MH Central Pkwy and Grant Line Road,Mountain House <br /> Type of Work: <br /> ❑ Soil Borings(geotechnical) ❑Groundwater Monitoring <br /> ❑ Soil Borings(environmental) ® Soil Vapor Monitoring <br /> ❑ Piezometer Installation ❑ Inclinometer Installation <br /> ® Other: Geoprobes <br /> Work Activities: Pushing 4 Geoprobe borings to approximately 20 feet below ground surface for the collection of <br /> soil samples for analysis,and 4 borings to approximately 6 feet for the collection of soil gas samples <br /> Site Personnel: <br /> Company: Responsibility: <br /> ENGEO Incorporated Environmental field observation and sampling <br /> Gregg Drilling,Inc. Direct push drilling <br /> Project Health and Safety Officer: =Site and Safety Officer: <br /> Divya Bhargava Divya Bhargava <br /> II. HAZARD EVALUATION <br /> Physical Hazards <br /> ❑ Heat ❑ Explosion/Fire Hazards <br /> ❑ Oxygen ❑ Excavations/Trenches <br /> ® Noise ® Slip,Trip,Fall <br /> ❑ Traffic ❑ Underground Hazards <br /> N Equipment ® Overhead Hazards <br /> 1 <br />