My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
4700 - Waste Tire Program
>
PR0524764
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 5:53:28 PM
Creation date
2/27/2019 2:56:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0524764
PE
4740
FACILITY_ID
FA0016665
FACILITY_NAME
BNSF RAILWAY
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109023
CURRENT_STATUS
02
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
CField
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 0 <br />Water Boards <br />00 <br />JUN 10 2013 <br />Centra! Valley Regional Water Ouality Control: Board <br />7 June 2013 <br />CERTIFIED MAIL NO. <br />7012 0470 0000 9903 5135 <br />Mr. Edward Phillips <br />Manager Environmental Operations <br />The BNSF Railway Company <br />740 East Carnegie Drive <br />San Bernardino, CA 92480 <br />NOTICE OF ADOPTION <br />OF <br />REVISION OF WASTE DISCHARGE REQUIREMENTS ORDER <br />FOR <br />THE BNSF RAILWAY COMPANY <br />FOR <br />BNSF STOCKTON INTERMODAL FACILITY <br />CLASS II SURFACE IMPOUNDMENT <br />SAN JOAQUIN COUNTY <br />TO ALL CONCERNED PERSONS AND AGENCIES: <br />Waste Discharge Requirements (WDRs) Order No. R5-2013-0070 for the BNSF Stockton Intermodal <br />Facility was adopted by the California Regional Water Quality Control Board, Central Valley Region at <br />its meeting on 31 May 2013. WDRs Order No. R5-2013-0070 rescinds previous WDRs Order 5-00- <br />133 except for purposes of enforcement. <br />A copy of the Order must be maintained at the facility and made available upon request. Please <br />review your WDRs carefully to ensure you understand all aspects of the discharge requirements. <br />Please note that the provisions of the WDRs require the Discharger to submit certain technical reports <br />by the dates provided in the Order. These submittals include the items listed below: <br />Required Report <br />Due Date <br />_ <br />Evaluation of groundwater monitoring network <br />G. BROWN JR. <br />0EOMUNG <br />'Fti�', !t� <br />,� f}9ba <br />GOVERNOR <br />Investigation of high TSS/turbidity in groundwater monitoring wells <br />MATTHEW RoDnioucz <br />Water balance analysis of the Class II surface impoundment <br />SECRETARY POP, <br />POP, <br />ENVIRONMENTAL PROTECTION <br />NOTICE OF ADOPTION <br />OF <br />REVISION OF WASTE DISCHARGE REQUIREMENTS ORDER <br />FOR <br />THE BNSF RAILWAY COMPANY <br />FOR <br />BNSF STOCKTON INTERMODAL FACILITY <br />CLASS II SURFACE IMPOUNDMENT <br />SAN JOAQUIN COUNTY <br />TO ALL CONCERNED PERSONS AND AGENCIES: <br />Waste Discharge Requirements (WDRs) Order No. R5-2013-0070 for the BNSF Stockton Intermodal <br />Facility was adopted by the California Regional Water Quality Control Board, Central Valley Region at <br />its meeting on 31 May 2013. WDRs Order No. R5-2013-0070 rescinds previous WDRs Order 5-00- <br />133 except for purposes of enforcement. <br />A copy of the Order must be maintained at the facility and made available upon request. Please <br />review your WDRs carefully to ensure you understand all aspects of the discharge requirements. <br />Please note that the provisions of the WDRs require the Discharger to submit certain technical reports <br />by the dates provided in the Order. These submittals include the items listed below: <br />Required Report <br />Due Date <br />_ <br />Evaluation of groundwater monitoring network <br />1 November 2013 <br />Revised groundwater supply well survey <br />1 November 2013 <br />Investigation of high TSS/turbidity in groundwater monitoring wells <br />1 November 2013 <br />Water balance analysis of the Class II surface impoundment <br />1 November 2013 <br />Cost estimate and financial assurance for corrective action <br />30 April of each year <br />Financial assurances for closure and post -closure maintenance <br />30 April of each year <br />KARL E. LoNCLEv SCD, P.E., CHAin I PAMELA C. CREEDON P.E., BCEE, ExrcuTIVC orncrn <br />11020 Sun Center Drive X200, Rancho Cordova, CA 95670 I`A'ww.walerboards.ca.gov/centralvalley <br />LJ RECYCLE. PAPER <br />
The URL can be used to link to this page
Your browser does not support the video tag.