My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
730
>
3500 - Local Oversight Program
>
PR0544199
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 11:46:35 PM
Creation date
2/27/2019 4:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544199
PE
3528
FACILITY_ID
FA0014183
FACILITY_NAME
RAYMOND INVESTMENT CORPORATION
STREET_NUMBER
730
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
730 E CHANNEL ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C C C C C C C C C C C C C C C C C <br /> GROUNDWATER WELL DEVELOPMENT FIELD FORM <br /> PROJECT#: 3849N ELL ID: MW-53 CONDOR <br /> R'Rrimble <br /> PROJECT ID:_ Raymond Invest. Corp. DATE: 188 Frank West Circle, Suite I, Stockton, CA 95206 <br /> PERSONNEL: CONDITIONS: (209)234-0518 <br /> DEVELOPMENT PROCEDURE: Standard Procedure/Other (specify) <br /> (Standard procedure consist of surging the well with a surge block for at least 20 minutes,followed by purging the well between 5 and 10 casing volumes of groundwater with a bailer or a pump,until the purged <br /> water becomes visually clear of sediment. If a variation of this procedure is used,provide a description in the additional notes section below,) <br /> DECONTAMINATION METHOD: Standard Procedure/Alcohol/Other(specify): <br /> (standard decontamination procedure consists of washing gear with a solution of DI water and a phosphate free soap and then double rinsing with DI water) <br /> PRE-PURGE DATA: PURGE VOLUME PROTOCOL(#of casing volumes)5 6 7 8 9 10 WELL CASING DIAMETER(in.) 2" <br /> WELL CASING DEPTH,INITIAL: DETAILED MEASURING POINT: MOC/NORTH SIDE CASING <br /> INITIAL DEPTH TO WATER:- DEPTH TO PRODUCT: PRODUCT LAYER: multipliers 0.75"=.0229,2"=.l63,4"=.653,6"-1.02 ' <br /> WATER COLUMN: _ #MULTIPLIER:_ *VOLUME PROTOCOL: <br /> =I casing volume total volume to be purged <br /> PURGE DATE: PURGE DEVICE: Stainlesss Bailer If pumped,specify: discharge rate(gpm) depth pump set(ft.) <br /> FIELD INSPECTION SAMPLE: Good-Moderate-Poor None-Sheen-Layer ODOR:None-Slight-Moderate-Strong <br /> 24 hour color clarity sheen or product phase thickness Describe <br /> TIME VOL.# VOL.PURGED TEMP(F/Q PH EC DO(me/L) MV rel. TDSg//L) TURB.(NTU) <br /> 0 0 GALL ONS <br /> NOTES <br /> 3 _ <br /> NOTES <br /> 4 _ <br /> NOTES <br /> 5 _ <br /> NOTES <br /> 6 _ <br /> NOTES <br /> 7 _ <br /> NOTES <br /> 8 _ <br /> NOTES <br /> 9 <br /> NOTES <br /> 10 _ <br /> NOTES <br /> Total Vol.Purged. Final Depth to Water Final Well Casing Depth <br /> ADDITIONAL NOTES: <br /> 0AFonTs\Field Formslgwmff103 updated\gwdff.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.