My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
730
>
3500 - Local Oversight Program
>
PR0544199
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 11:46:35 PM
Creation date
2/27/2019 4:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544199
PE
3528
FACILITY_ID
FA0014183
FACILITY_NAME
RAYMOND INVESTMENT CORPORATION
STREET_NUMBER
730
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
730 E CHANNEL ST
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4"' � Revised Additional Vapor and Groundwater Monitoring Well Work Plan <br /> Raymond Investment Corporation <br /> October 30,2009 <br /> Page 6 <br /> V <br /> 14 feet below the water table to 6 foot above the water table. A flush-threaded PVC bottom cap will be <br /> placed at the bottom of the screen section in the well. Blank PVC casing will be installed above the <br /> L. screens to the ground surface. A filter pack of#2112 Monterey sand will be placed in the annular space to <br /> approximately two feet above the.screens while the augers are in place. The depth of the sand in the <br /> annulus of the well will be monitored with a weighted tape measure while the sand is being placed and r <br /> y the augers are being gradually retracted to avoid bridging. To form a protective seal, approximately five- Zi*nir <br /> feet of bentonite chips will be installed. abovethe sand in the well. The bentonite chips will be installed <br /> as the augers are retracted. The bentonite will be hydrated using potable water. A surface seal of neat <br /> cement will be tremied into the annulus of the well and will extend from the bentonite to the ground ,�2�'!2� <br /> LAsurface. The monitoring wells will be completed with locking caps and traffic boxes installed flush with <br /> the ground surface. Details of the well construction will be noted on the geologic log, including the depth <br /> intervals of the screen, sand pack, and seals. A generalized shallow monitoring well construction diagram <br /> is included as Figure 4,Appendix A. <br /> +� Table 1.Monitoring Well Construction and Sample Interval Details <br /> Well ID MW-4D MW-5 MW-6 MW-7 8 9 <br /> Location Near MW4 Northeast from Near SB-9 Near corner of Grant <br /> +� and SB-7 MW-4 and Channel St. <br /> Sample interval None Every 5 feet - 25, 35, 40 feet None <br /> Laboratory analysis None 5, 15, 25, 35,45 feet 25, 35, 40 feet None <br /> interval 4ry 5a.13 <br /> Neat cement interval 0-5 feet 0-18 feet 0-18 feet 0-18 feet <br /> Bentonite interval, 5$ 63 feet 18-23 feet 18.23 feet 18-23 feet <br /> LA pellets or chis <br /> Sand interval, 2112 feet 23-45 feet 23-45 feet 23-45 feet — _ <br /> washed Montere 56 '20 <br /> ry Screen interval, 60-70 feet 25-45 feet 25-45 feet - 25-45 feet` <br /> 0.010" slotted PVC <br /> Total depth 70 feet 45 feet - 45 feet 45 feet <br /> 4.2.2 Soil Vapor Monitoring Well Installation Procedures <br /> Soil vapor monitoring well installation will be conducted with hand auger borings (SV-4, SV-5 and <br /> La SV-6) and expendable soil gas implant probes. The hand auger borings will be advanced to a depth of <br /> five feet bgs through holes cored in the concrete surface. The soil encountered in the hand auger borings <br /> will be described and logged. The hand auger will be thoroughly cleaned before each boring is advanced <br /> +� using laboratory-grade, non-phosphate detergent and deionized water and double rinsed with deionized <br /> water. <br /> L• One expendable soil gas implant probe will be installed in each boring.`Each probe will be connected to <br /> '/4-inch Teflon or polyethylene tubing and lowered to th toottom of the boring while the open end of the <br /> tubing is held above the ground surface. A filter pack of#3 Monterey sand will be placed in the boring to <br /> LM approximately one foot,above the probe. Dry granular bentonite will be placed in the boring from the top <br /> of the sand to onfoot above the sand, and then powdered bentonite slurry will be placed to the ground <br /> surface. The purpose of the dry granular bentonite is to protect the sand from being impacted by the wet <br /> bentonite slurry above. The purpose of the bentonite slurry is to provide vapor barrier to surface air <br /> tr <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.