Laserfiche WebLink
_ '1 --�_ —�� --_-- - —_�—-----_ First Quarter 2406 Quarterly Groundwater Momtormg Report --_ <br /> Raymond Investment Corporation,Stockton,CA <br /> Page 3 of 4 <br /> . Table 2 <br /> Groundwater Sample Analytical Results (March 9, 2006) <br /> Sample 1 D Sample Date B T E X TPH-G TEPH-D MTBE <br /> (n/L) 01g/L) (FLS-) W/L) (µg/L) (pg/L) (µgr-) <br /> MW-1 03/09/06 <0 5 <0 5 <0 5 -< I 0 <50 <50 <0 5 <br /> MW-2 1 03/09/06 <0 5 1 <0 5 1 <05 < 10 <50 1 <50 I <0 5 <br /> Unit Converstons pg/L=nucrogr-ams per liter=parts per billion(ppb) <br /> Analytical <br /> B,T,H,X-benzene,toluene ethyl benzene total xylenes <br /> TP14-G=total petroleum hydrocarbons,quantified as gasoline <br /> TEPH-D=total extractable petroleum hydrocarbons quantified as diesel(D) <br /> MTBE=methyl tertiary-butyl ether <br /> The laboratory analytical results indicate that none of the analytical constituents were detected at or above <br /> the laboratory reported detection limits in the groundwater samples collected from MW-1 and MW-2 on <br /> March 9, 2006 This is generally consistent with historic groundwater monitoring results (see Table A, r <br /> attached) <br /> FUTURE WORK/RECOMMENDATIONS <br /> Based on historic groundwater monitoring data for the Site through the third quarter of 2005, Condor <br /> recommended consideration for Site closure in the Third Quarter Groundwater Monitoring Report, dated <br /> October 5, 2005 The results of the November 18, 2005 and March 9, 2006 monitoring further <br /> substantiate the historic data and support a"low nsk groundwater"designation for the Site <br /> Ms McCartney of the SJCEHD indicated in her letter dated February 22, 2006 that a recommendation for <br /> Site closure could not yet be supported because the SJCEHD did not believe that the vertical extent of <br /> impacted soil and groundwater had been demonstrated in the area of soil borings SB3 and SB4 (advanced <br /> in May 2004), and also that further groundwater and soil investigation will be necessary to assess the <br /> lateral extent of hydrocarbon contamination in the area of and down-gradient of SB3 Ms McCartney <br /> - - -- indicated that additional monitoring wells would be required to assess the lateral extent of groundwater — - - <br /> contamination and requested that a work plan be submitted to the SJCEHD by April 10, 2006 McCartney <br /> also requested in her February 22, 2006 letter that a sensitive receptor survey (SRS) report and a work <br /> plan to evaluate the threat of vapor intrusion inside the Site buildings be submitted by May 1, 2006 At <br /> Condor's request, Ms McCartney approved to extend the deadline to submit the SRS report and vapor <br /> intrusion evaluation work plan to June 30, 2006, and to extend the deadline to submit the work plan to <br /> address the lateral and vertical extents of contamination to May 31, 2006, in her letter dated April 7, 2006 <br /> Condor is currently preparing the work plans and SRS report The next quarterly monitoring event is <br /> scheduled for June 2006 <br /> LIMITATIONS <br /> This report was prepared under the direct supervision of a Certified Hydrogeologist in the State of <br /> California The standard of care for all services performed or furnished by Condor is commensurate with <br /> the care and skill ordinarily used by members of the environmental profession practicing under similar <br /> conditions at the same time in the same locality Condor is not responsible for the accuracy and <br /> completeness of information collected and developed by others <br /> i <br /> �� CONDOR <br />