Laserfiche WebLink
ITABLE OF CONTENTS <br /> 10 INTRODUCTION . . . . .. .. .. . •• •- •• 1 <br /> 20 PROJECT BACKGROUND. 1 <br /> 30 DIRECT PUSH BORING FIELD PROCEDURES .. . .2 <br /> I - 3 1 SITE PREPARATION 2 - <br /> 3 2 DIRECT PUSH BORING PROCEDURES 2 <br /> • 3 2 1 Soil Sampling 2 - <br />' 3 2 2 Groundwater Sampling 3 <br /> 3 3 LABORATORY ANALYSES 3 <br /> 4 0 INVESTIGATION RESULTS .. ... .. .. . . .... . .. . ..---- . . . ... . ...3 <br /> 4 1 FIELD OBSERVATIONS 3 <br /> 4 2 RESULTS OF LABORATORY ANALYSES 4 <br /> . . . . <br /> 5 0 DISCUSSION •6 <br /> 6 0 RECOMMENDATIONS -- - - -•. .. ... .. .. . . .6 <br /> 7.0 LIMITATIONS .. . . . .. .. .. . .. ..6 <br />' APPENDICES <br /> APPENDIX A <br /> Figure I Vicinity Map <br /> Figure 2 Site Map with Boring Locations <br /> Figure 3 TPH-G in Soil Laboratory Analytical Results <br /> Figure 4 TEPH-D in Soil Laboratory Analytical Results <br /> Figure 5 TPH-G and TEPH-D in Groundwater Laboratory Analytical Results <br /> APPENDIX B <br /> Geological Logs <br />' APPENDIX C <br /> Soil and Groundwater Sample Laboratory Analytical Reports <br /> Chain-of-Custody Records <br /> I <br /> I <br /> I <br /> as <br /> �� n CONDOR <br />