Laserfiche WebLink
FORWARD LANDFILL <br /> SPILL PREVENTION CONTROL AND <br /> COUNTERMEASURES PLAN <br /> Original Date of Plan: JANUARY 2019 <br /> Revised Date: <br /> Designated person accountable for spill prevention: <br /> CERTIFICATION <br /> I hereby certify this Plan to be effective to satisfy the requirements of 40 CFR Part 112.3(d). <br /> I attest that <br /> 1. 1 am familiar with the applicable requirements of 40 CFR part 112; <br /> 2. 1 or my agent have visited and examined the facility; <br /> 3. the Plan has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards, and with the requirements of 40 CFR <br /> part 112: <br /> 4. procedures for required inspections and testing have been established; and <br /> 5. the plan is adequate for the facility. <br /> Engineer Michael A Cullinane, P E 6O pFOFess,o <br /> h�E PEI A. <br /> Signature /� ,✓� „c� 0 c2`O2 <br /> i � F yc3 <br /> 41987 n m <br /> State & Registration Number: California. License No. 41981 N A <br /> Date: �7 2312 C) CIVIL <br /> 9TH°F c4LIF° �\P <br /> FORWARD LANDFILL SPILL PREVENTION CONTROL AND <br /> COUNTERMEASURES PLAN <br /> z:\pr.j.,o\.Iliad waste\fonvaftl\SPS Plan 2015\ta 1\fo ,d If Epxp_P01.9.d., <br />