Laserfiche WebLink
AST SP001 ANNUAL INSPECTION <br /> General Inspection Information: <br /> (36 months Rom inspection <br /> Inspection Date: 1242019 Retain Until Data: 1/242022 date) <br /> Prior Inspection Date: Unavailable Inspector Name: Philp Thiel <br /> Tanks Inspeded(Ors):15w40 T2 NEW OIL <br /> Inspection Guidance: <br /> For equipment not included in this standard,follow the manufacturer recommended inspection/testing schedules and <br /> procedures. <br /> ➢ The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual <br /> inspection does not require a Certified Inspector.It shall be performed by an owners inspector who is familiar with the site <br /> and can identify changes and developing problems. <br /> D Remove promptly upon discovery standing water or liquid in the primary tank,secondary containment area, interstice,or <br /> spill container.Before discharge to the environment, inspect the liquid for regulated products or other contaminants and <br /> disposed of it properly. <br /> 1, In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility must regularly test liquid <br /> level sensing devices to ensure proper operation(40 CFR 112.8(c)(8)(v)). <br /> ➢ Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST <br /> design,a Certified Inspector,or a tank manufacturer who will determine the corrective action. Note the non-conformance and <br /> corresponding corrective action in the comment section. <br /> i Retain the completed checklists for 36 months. <br /> Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> L Note: If a change has occurred to the tank system or containment that may affect the SPCC plan,the condition <br /> should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC <br /> development and implementation. <br /> Item Task Status <br /> 1.0 Tank Containment <br /> 1.1 Containment structure Is structure Ree of: R Yes r No r N/A <br /> • Hales or cracks in containment wall or Floor 17 Yes r No r N/A <br /> • Washout I✓Yes r No r N/A <br /> • Liner degradation I✓Yes r No r N/A <br /> • Corrosion <br /> • Leakage I✓Yes r No r N/A <br /> • Paint failure P Yes r No r N/A <br /> • Tank settling A Yes r No r N/A <br /> Comments: <br /> 2.0 Tank Foundation and Sul ports <br /> 2.1 Foundation No observed settlement or foundation washout? r Yes r No <br /> 2.2 Concrete pad or ring wall No visible cracking or spelling? 171 Yes r No r N/A <br /> 2.3 Supports No visible corrosion, paint failure,etc.? 17 Yes r No r N/A <br /> 2.4 Water drainage Water drainage away from tank? r Yes r No r- <br /> 2.5 <br /> 2.5 Tank grounding Strap secured and in good condition? r Yes r No r N/A <br /> If intrinsically ground,please note in comments. <br /> Comments: <br /> WO: 6703239 SEPTEMBER2016 <br />