My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23100
>
2800 - Aboveground Petroleum Storage Program
>
PR0516434
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2019 4:10:39 PM
Creation date
2/28/2019 11:34:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516434
PE
2832
FACILITY_ID
FA0010206
FACILITY_NAME
VALLEY PACIFIC PETROLEUM
STREET_NUMBER
23100
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23906004
CURRENT_STATUS
01
SITE_LOCATION
23100 S KASSON RD
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br /> SAN u ] OAQUIN = <br /> — C_. C) U N Y <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name : Facility Address : Date : <br /> VALLEY PACIFIC PETROLEUM 23100 S KASSON RD , TRACY February 11 , 2019 <br /> Other Violations <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑ V ❑ R ❑ COS <br /> 4050 See below Unlisted Abandonment/Illegal Disposal/Unauthorized Treatment violation ❑ V ❑ R ❑ COS <br /> SUMMARY OF VIOLATIONS <br /> ( CLASS I , CLASS II , or MINOR - Notice to Comply ) <br /> Item # Remarks <br /> 203 CFR 112 . 3 Failure to implement the SPCC Plan . <br /> The SPCC plan calls for wheel chocks to be used at the loading rack area . Wheel chocks are currently not being <br /> used . The SPCC plan calls for " Report Spills Immediately " signs with VPPS contact information to be located in the <br /> dispenser area , " Report Spills Immediately" signs were not observed . The owner or operator or an onshore or <br /> offshore facility subject to this section must prepare in writing and implement a Spill Prevention Control and <br /> Countermeasure Plan ( hereafter "SPCC Plan" or " Plan"Y ' in accordance with § 112 . 7 and any other applicable <br /> section of this part . Implement the plan as written or amend the SPCC plan to reflect actual procedures and <br /> practices at the facility . <br /> This is a minor violation . <br /> 618 CFR 112 . 7 ( e) , 112 . 8 ( c) (6 ) Failed to keep records of procedures , inspections , or integrity tests for three years . <br /> The SPCC plan calls for annual inspections per STI SP001 standards to be conducted . Annual inspection records of <br /> the tanks , performed by facility personnel , were not at the site . Inspections and testing shall be conducted on all <br /> aboveground liquid petroleum containers larger than 55 gallons , including all 55 gallon drums of oil . Records of <br /> these inspections and tests shall be signed by the appropriate supervisor or inspector and kept on site with the Spill <br /> Prevention , Control , and Countermeasure (SPCC) Plan for a period of three years . Immediately begin necessary <br /> testing and inspections for all Aboveground Petroleum Storage Act regulated containers and maintain on site with <br /> the SPCC Plan . <br /> This is a Class II violation . <br /> 626 CFR 112 . 7 ( h ) ( 1 ) Loading /unloading rack containment system not adequate to contain spill . <br /> The SPCC plan states that the secondary containment for the loading rack is not capable of holding at least the <br /> maximum capacity of the the largest single compartment of a truck loaded at the rack . The SPCC plan was certified <br /> by the engineer in 2016 . A new containment system was built in 2018 . A facility must provide sufficient secondary <br /> containment capable of holding at least the maximum capacity of any single compartment of a tank car or truck <br /> loaded or unloaded at the facility . Immediately begin implementing the necessary procedures , as described in the <br /> Spill Prevention , Control , and Countermeasure Plan , to provide sufficient secondary containment in all tank car and <br /> tank truck loading and unloading areas . <br /> Note : A new SPCC plan is being certified by a Professional Engineer and addresses the new containment area , per <br /> facility . <br /> This is a repeat violation , Class ll . <br /> FA0010206 PR0516434 SCO01 02/11 /2019 <br /> EHD 28-01 Rev, 09/27/2018 Page 4 of 5 Aboveground Petroleum Storage Act OIR <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468- 3420 F 209 464 -0138 1 www . sjcehd . com <br />
The URL can be used to link to this page
Your browser does not support the video tag.