Laserfiche WebLink
SEP -24-2087 13:56 Service Station Systems <br />Monitoring System Certification - F 3 of 3 <br />Site Address:_ 1804 West 11Th. Street & Corral Hallow <br />F. In - Tank Gauging / SIR Equipment: <br />408 938 8888 P.05 <br />Date of Testing/Servicing. 8/2/07 <br />r% Check this box if tank gauging is used only for inventory control_ <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging Equipment is used to perform leak detection monitoring. <br />Com tete the foliowin checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ,ground faults? <br />❑ Yes ❑ Nos Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes 1 ❑ Noy Was accuracy of system water level readings tested? <br />0 Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLD's are not installed. <br />Complete the following checklist - <br />M Yes <br />❑ No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak reate: t8 3 g.p_h_ (L); ❑ 0.1 g.p.h. (2) ❑ 0.2 g.p.h. (2). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />11 Yes <br />❑ No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />2 Yes <br />❑ No* <br />Was the testing a paratus proRerly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />to N/A <br />M Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />M Yes <br />p No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />M Yes <br />p No* <br />For electronic LI,D's, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />11 Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />M Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- it accuun n ueiuw, aescnDe now ana wnen these aeticeenctes were or will be corrected. <br />K Comments: <br />