My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2004 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:21:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2008
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br />a: <br />N <br />CO <br />cn <br />O] <br />OD <br />r� <br />m <br />03 <br />m <br />v <br />T <br />m <br />m <br />N <br />I <br />V <br />N <br />I <br />IL <br />W <br />Co <br />Site Tested <br />Gil bNR Testing <br />Safeway <br />1804 West 11 Th. Street <br />Tracy, CA 95376 - <br />Product and Vapor Overfill Containment <br />Test Results <br />Test performed by <br />Serv. Sta. Sys. <br />680 Quinn Ave. <br />San Jose CA 95112 <br />License #: 485184 <br />Tech_ Steve M Parmenter <br />Test Date: 812!07 <br />Test Method Developed By ❑ Spill Bucket Manufacturer El rndustry Standard ❑ Professional Engineer ❑ Olher(Speciry) <br />Test Method Used: ® Hydrostatic 0 Other(Speorfy) <br />Test Equipment Used:Measuring Tape <br />Equipment Resolution=1/16 in. Example - 118" increments <br />Pass/Fail Threshold or Criteria: Zero Loss <br />Comments: Per Inspector- Vapor Bucket Test not needed. Fill bucket in tate process of being permitted so the replacement can be made. <br />Product Fill Bucket <br />Vapor Fill Bucket <br />Tank /Grade <br />Wait <br />(min) <br />Start <br />Stop <br />Time <br />(hrs.j <br />Gal. <br />Depth <br />Initial - Final = Change <br />Pass <br />/Fail <br />Gal. Depth <br />Pass <br />Initial - Final = Change /Fail <br />01 - Regu <br />15 <br />11:00am <br />12:00pm <br />1.0 <br />5 <br />10.25 <br />9.63 - 9.00 = 0.63 <br />fail <br />02 - Plus <br />15 <br />11:00am <br />12:OOpm <br />1.0 <br />5 <br />10.00 <br />9.63 - 9.63 = 0.00 <br />Pass <br />03 - Prem <br />15 <br />11:00am <br />12:00prn <br />1.0 <br />5 <br />10.00 <br />9.50 - 9.50 = 0.00 <br />Pass <br />Comments: Per Inspector- Vapor Bucket Test not needed. Fill bucket in tate process of being permitted so the replacement can be made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.