Laserfiche WebLink
J VY i\l.D,Jdijualy 611V4 ---o- <br /> 9. 'TLL/OVERFILL CONTAINMENT Br '-�S S� <br /> Facility is Not Equipped With Spi]U(-.. rfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other (Speci) <br /> Test Method Used: ❑Pressure ❑Vacuum lXHydrostatic <br /> ❑Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> A4lMIt1'111w <br /> ° '' Spill Box# Spill Box# �� Spill Box# J Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: !{" 14 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: / b <br /> Test Start Time: :0 901 C) <br /> Initial Reading(R,): <br /> Test End Time: i 000 <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or7,q�� { <br /> Criteria: <br /> Test Result: Pass ❑Fail Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail <br /> Commenis—(include information on repairs made prior tot sting, ano recommended follow-up for failed tests) <br />