My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2004 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:21:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2008
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT-01-2004 18 37 SERVICE STATION SYSTEM 40e 971 0135 P.06 <br /> Monitoring System Certification-Fay J of 3 <br /> Site Address: 1804 West 11Th. Street @ Corral Hallow Date of Testing/Servicing: 912104 <br /> F. In-Tank Ganging/SIR Equipment: @,g Check this box if tank gauging is used only for inventory contro <br /> L] Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist. <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> C1 Yes p No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑Na* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> L]Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD); ❑ Check this box if LLD's are not installed. <br /> Complete the following checklist; <br /> Ig Yes p No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑N/A (Check all that apply) Simulated leak reate: N 3 g.p.h. (1.); ❑ 0.1 g.p.h.(2.); o 0.2 g.p.h.(2). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2_ Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> ❑Yes ig No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> g Yes ❑No* Was the testing apparatus properly calibrated? <br /> Q Yes p No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> 11 N/A <br /> tg Yes ❑No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> Qg Yes p No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑N/A or disconnected? <br /> Ig Yes p No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑N/A malfunctions or fails a test? <br /> 19 Yes p No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> pg Yes ❑No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Regular north turbine PLLD did not pass 3 gph test possible air in line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.