Laserfiche WebLink
.ZUL-02-2010 16:52 Service Station Systerns 408 938 8888 P.06 <br />Monitoring Syatem Certification - Pat, A3 <br />Site Address: 1987 West 11Th. Street <br />Date of Testing/Servicing: 612110 <br />F. In - Tank Gauging / SIR Equipment: Ix Check this box if tank gaugin,2 is used only for inventory control. <br />Cl Check this box if no tank gauging or SCR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />❑ Yes <br />0 No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup'? <br />❑ Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />o Yes <br />a No <br />❑ Noy` <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ Noy` <br />Were all items on the equipment manufacturer's maintenance checklist completed'? <br />* in Section H below, describe how and when these deficiencies were or will ne correctea. <br />G. Line Leak Detectors (LLD): Cl Check this box if LLD's are not installed. <br />Comnlete the following checklist: <br />CK Yes <br />0 No* <br />For equipment start -ftp or annual cduipment certification was a leak simulated to verify LI.,D performance? <br />❑ N/A <br />(Check all that apply) Simulated leak reate: ix 3 g.p.h. (L); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certilieation required only for electronic LLD start-up. <br />lH Yes <br />❑ No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements'? <br />ES Yes <br />0 No* <br />Was the testing apparaws properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />B N/A <br />E3 Yes <br />Q No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />E8 Yes <br />❑ No* <br />For electronic LLD's. does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />tg Yes <br />❑ Nil* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />0 N/A <br />malfunctions or fails a test? <br />Ix Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />EZ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* in Section H below, describe how and when these deficiencies were or will ne correctea. <br />H. Comments: <br />