My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2009 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:35:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2012
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />Piping Run # 87 —S Piping Run # 91 -S Piping Run # Diesel —S <br />Piping Material: Coflex Coflex Coflex <br />Piping Manufacturer: <br />Western Fiberglass <br />Western Fiberglass <br />Western Fiberglass <br />Piping Diameter: <br />2" <br />1 'h" <br />Length of Piping Run: <br />Product Stored: <br />Gasoline <br />Gasoline <br />Diesel <br />Method and location of <br />-piping-run isolation: <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />12:50 pm <br />12:50 pm <br />10:20 am <br />Initial Reading (R1): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />1:50 pm <br />1:50 pm <br />11:20 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hr. <br />1 hr. <br />1 hr. <br />Change in Reading (RF-Ri): <br />none <br />none <br />none <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />Test Result: <br />O Pass 0 Fait <br />I El Pass 0 Fail <br />© Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />UDC 3/4 — replaced a 20x20 test boot (diesel) <br />UDC 7/8 — replaced a 20x20 test boot (2 diesel) and 3 jumpers — also replaced 20x2OA test boot on #7 side (diesel) <br />UDC 11/12 — replaced a 20x20 test boot (2 diesel) and 3 jumpers — also tightened clamps <br />UDC 15/16 — replaced all 4 20x20 test boots, 2 2.5x2.5A test boots (2 87, 91 and Diesel) and 3 jumpers — also tightened clamps <br />UDC 19/20 — replaced all 4 20x20 test boots, 2 2.5x2.5A test boots (2 87, 91 and Diesel) and 3 jumpers <br />* 87-S and 91-S was tested on 4/1 /10 <br />*Diesel -S was tested on 4/7/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.